Nebraska electricity by city
Electric company in Beatrice, NE: $164 median bill
Norris Public Power District is the electric company listed for ZIP codes in Beatrice (NREL and OpenEI, 2024), and households report a median bill of about $164 a month (Census ACS 2020-2024, estimated from reported brackets). A year of the median bill is about 3.4% of median household income in Beatrice, against 2.2% across Nebraska.
Latest data: EIA 2025, Census 2020-2024; data loaded .
Who sells electricity in Beatrice?
One utility, Norris Public Power District, appears in the ZIP codes that overlap Beatrice, at an average residential price of 9.54¢ in 2025.
| Utility | Type | Average price | Year and source | Residential customers | Share of city land |
|---|---|---|---|---|---|
| Norris Public Power District | Public power, full service | 9.54¢ | 2025, EIA-861 | 19,395 | 100% |
EIA's service-territory list for Gage County also names City of Beatrice, City of Fairbury, City of Wymore, and Nebraska Public Power District. These sell somewhere in the county; EIA does not say which neighborhoods.
Source: NREL and OpenEI, U.S. Electric Utility Companies and Rates, ZIP lookup, 2024 file. Average prices: EIA Form EIA-861, Sales to Ultimate Customers, 2025 unless the row names another year.
What do households in Beatrice report paying for electricity?
The median household that pays its own electric bill in Beatrice reports about $164 a month, 16% above the Nebraska median and 5% above the U.S. median. 5,103 households reported a bill, and 7% of households pay no separate electric bill.
Share of households by reported monthly electric bill, 2020-2024
Across Nebraska, the Census median runs 28% above EIA's average bill for the same years, and the two measure different things. Why they differ.
The median is estimated by interpolating inside the Census dollar brackets, so it is an estimate rather than a published figure. The bill figures cover 2020-2024; the utility prices above are for the year shown in each row.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year. U.S. row: the 51 state rows summed and re-interpolated.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
How many homes in Beatrice heat with electricity?
39% of Beatrice homes heat with electricity, 8 points above the Nebraska share and 2 points below the U.S. share. Gas heats 60% of homes.
| Area | Electricity | Gas | Other |
|---|---|---|---|
| Beatrice | 39% | 60% | 1% |
| Nebraska | 32% | 66% | 2% |
| U.S. | 41% | 51% | 7% |
Source: U.S. Census Bureau, American Community Survey table B25040, 2020-2024 5-year.
How big is the electric bill against income in Beatrice?
A year of the median bill comes to about $1,967, or roughly 3.4% of Beatrice's median household income of $57,264, against 2.2% across Nebraska. This is an estimate: it divides twelve times a bracket-based median by a separate median, and both cover 2020-2024.
Source: U.S. Census Bureau, American Community Survey tables B25132 and B19013, 2020-2024 5-year.
What does it cost to run common appliances in Beatrice?
A space heater at the usage below runs about $34.35 a month at Norris Public Power District's average price of 9.54¢.
| Appliance | kWh a month | Norris Public Power District 9.54¢, 2025 |
|---|---|---|
| Space heater | 360 | $34.35 |
| Central air conditioner | 193 | $18.43 |
| Electric water heater | 226 | $21.51 |
| Refrigerator | 51 | $4.90 |
| Clothes dryer | 57 | $5.41 |
| Television | 14 | $1.34 |
Source: Appliance wattage and hours on each appliance's page; prices as in the utility table above.
Which other cities are in Gage County?
No other city in Gage County has a page here, so these are the Nebraska cities closest in population.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
What power plants are in Gage County?
1 power plant with 247 MW of capacity is in Gage County, the largest being Beatrice at 247 MW.
| Plant | Fuel | Capacity (MW) |
|---|---|---|
| Beatrice | Natural gas | 247 |
Source: EIA Form EIA-860, 2025.