Montana electricity by city
Electric company in Belgrade, MT: $143 median bill
NorthWestern Energy LLC is the electric company listed for ZIP codes in Belgrade (NREL and OpenEI, 2024), and households report a median bill of about $143 a month (Census ACS 2020-2024, estimated from reported brackets). That median is 13% above the Montana median.
Latest data: EIA 2025, Census 2020-2024; data loaded .
Who sells electricity in Belgrade?
One utility, NorthWestern Energy LLC, appears in the ZIP codes that overlap Belgrade, at an average residential price of 14.42¢ in 2025.
| Utility | Type | Average price | Year and source | Residential customers | Share of city land |
|---|---|---|---|---|---|
| NorthWestern Energy LLC | Investor-owned, full service | 14.42¢ | 2025, EIA-861 | 333,711 | 100% |
EIA's service-territory list for Gallatin County also names Fall River Rural Elec Coop Inc, Park Electric Coop Inc, and Vigilante Electric Coop, Inc. These sell somewhere in the county; EIA does not say which neighborhoods.
Source: NREL and OpenEI, U.S. Electric Utility Companies and Rates, ZIP lookup, 2024 file. Average prices: EIA Form EIA-861, Sales to Ultimate Customers, 2025 unless the row names another year.
What do households in Belgrade report paying for electricity?
The median household that pays its own electric bill in Belgrade reports about $143 a month, 13% above the Montana median and 8% below the U.S. median. 4,767 households reported a bill, and 2% of households pay no separate electric bill. The Census Bureau publishes a margin of error with these survey figures; RateWatt does not hold it, and in a place this size it is wider than for a county or state, so a small gap may not be a real one.
Share of households by reported monthly electric bill, 2020-2024
Across Montana, the Census median runs 23% above EIA's average bill for the same years, and the two measure different things. Why they differ.
The median is estimated by interpolating inside the Census dollar brackets, so it is an estimate rather than a published figure. The bill figures cover 2020-2024; the utility prices above are for the year shown in each row.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year. U.S. row: the 51 state rows summed and re-interpolated.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
How many homes in Belgrade heat with electricity?
34% of Belgrade homes heat with electricity, 7 points above the Montana share and 7 points below the U.S. share. Gas heats 64% of homes.
| Area | Electricity | Gas | Other |
|---|---|---|---|
| Belgrade | 34% | 64% | 2% |
| Montana | 27% | 63% | 9% |
| U.S. | 41% | 51% | 7% |
Source: U.S. Census Bureau, American Community Survey table B25040, 2020-2024 5-year.
How big is the electric bill against income in Belgrade?
A year of the median bill comes to about $1,719, or roughly 1.8% of Belgrade's median household income of $97,328, against 2.1% across Montana. This is an estimate: it divides twelve times a bracket-based median by a separate median, and both cover 2020-2024.
Source: U.S. Census Bureau, American Community Survey tables B25132 and B19013, 2020-2024 5-year.
What does it cost to run common appliances in Belgrade?
A space heater at the usage below runs about $51.93 a month at NorthWestern Energy LLC's average price of 14.42¢.
| Appliance | kWh a month | NorthWestern Energy LLC 14.42¢, 2025 |
|---|---|---|
| Space heater | 360 | $51.93 |
| Central air conditioner | 193 | $27.87 |
| Electric water heater | 226 | $32.53 |
| Refrigerator | 51 | $7.41 |
| Clothes dryer | 57 | $8.18 |
| Television | 14 | $2.02 |
Source: Appliance wattage and hours on each appliance's page; prices as in the utility table above.
Which other cities are in Gallatin County?
Gallatin County also includes Bozeman; Bozeman reports $122 a month against $143 here.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
What power plants are in Gallatin County?
1 power plant with 4 MW of capacity is in Gallatin County, the largest being GCC Trident Solar Project at 4 MW.
| Plant | Fuel | Capacity (MW) |
|---|---|---|
| GCC Trident Solar Project | Solar | 4 |