Virginia electricity by city
Electric company in Burke Centre, VA: $166 median bill
Dominion Energy Virginia is the electric company listed for ZIP codes in Burke Centre (NREL and OpenEI, 2024), and households report a median bill of about $166 a month (Census ACS 2020-2024, estimated from reported brackets). The median bill in Burke Centre is 18% above the Fairfax County median of $140.
Latest data: EIA 2025, Census 2020-2024; data loaded .
Who sells electricity in Burke Centre?
One utility, Dominion Energy Virginia, appears in the ZIP codes that overlap Burke Centre, at an average residential price of 15.20¢ in 2025.
| Utility | Type | Average price | Year and source | Residential customers | Share of city land |
|---|---|---|---|---|---|
| Dominion Energy Virginia | Investor-owned, full service | 15.20¢ | 2025, EIA-861 | 2,408,901 | 96% |
EIA's service-territory list for Fairfax County also names Northern Virginia Elec Coop. These sell somewhere in the county; EIA does not say which neighborhoods.
Source: NREL and OpenEI, U.S. Electric Utility Companies and Rates, ZIP lookup, 2024 file. Average prices: EIA Form EIA-861, Sales to Ultimate Customers, 2025 unless the row names another year.
What do households in Burke Centre report paying for electricity?
The median household that pays its own electric bill in Burke Centre reports about $166 a month, 2% above the Virginia median and 6% above the U.S. median. 5,842 households reported a bill, and 2% of households pay no separate electric bill.
Share of households by reported monthly electric bill, 2020-2024
Across Virginia, the Census median runs 17% above EIA's average bill for the same years, and the two measure different things. Why they differ.
The median is estimated by interpolating inside the Census dollar brackets, so it is an estimate rather than a published figure. The bill figures cover 2020-2024; the utility prices above are for the year shown in each row.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year. U.S. row: the 51 state rows summed and re-interpolated.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
How many homes in Burke Centre heat with electricity?
72% of Burke Centre homes heat with electricity, 14 points above the Virginia share and 30 points above the U.S. share. Gas heats 27% of homes.
| Area | Electricity | Gas | Other |
|---|---|---|---|
| Burke Centre | 72% | 27% | 1% |
| Virginia | 57% | 37% | 6% |
| U.S. | 41% | 51% | 7% |
Source: U.S. Census Bureau, American Community Survey table B25040, 2020-2024 5-year.
How big is the electric bill against income in Burke Centre?
A year of the median bill comes to about $1,986, or roughly 1.2% of Burke Centre's median household income of $164,123, against 2.1% across Virginia. This is an estimate: it divides twelve times a bracket-based median by a separate median, and both cover 2020-2024.
Source: U.S. Census Bureau, American Community Survey tables B25132 and B19013, 2020-2024 5-year.
What does it cost to run common appliances in Burke Centre?
A space heater at the usage below runs about $54.71 a month at Dominion Energy Virginia's average price of 15.20¢.
| Appliance | kWh a month | Dominion Energy Virginia 15.20¢, 2025 |
|---|---|---|
| Space heater | 360 | $54.71 |
| Central air conditioner | 193 | $29.36 |
| Electric water heater | 226 | $34.27 |
| Refrigerator | 51 | $7.81 |
| Clothes dryer | 57 | $8.62 |
| Television | 14 | $2.13 |
Source: Appliance wattage and hours on each appliance's page; prices as in the utility table above.
Which other cities are in Fairfax County?
Fairfax County also includes Centreville, Reston, and McLean; Centreville reports $132 a month against $166 here.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
What power plants are in Fairfax County?
4 power plants with 133 MW of capacity are in Fairfax County, the largest being Covanta Fairfax Energy at 124 MW.
| Plant | Fuel | Capacity (MW) |
|---|---|---|
| Covanta Fairfax Energy | Biomass | 124 |
| Fairfax Landfill | Solar | 5 |
| I 95 Landfill Phase II | Biomass | 3 |
| Reston Town Center Solar 1 | Solar | 1 |
Source: EIA Form EIA-860, 2025.