Florida electricity by city
Electric company in Golden Gate, FL: $186 median bill
FPL is the electric company listed for ZIP codes in Golden Gate (NREL and OpenEI, 2024), and households report a median bill of about $186 a month (Census ACS 2020-2024, estimated from reported brackets). The median bill in Golden Gate is 17% above the Collier County median of $159.
Latest data: EIA 2025, Census 2020-2024; data loaded .
Who sells electricity in Golden Gate?
One utility, FPL, appears in the ZIP codes that overlap Golden Gate, at an average residential price of 14.62¢ in 2025.
| Utility | Type | Average price | Year and source | Residential customers | Share of city land |
|---|---|---|---|---|---|
| FPL | Investor-owned, full service | 14.62¢ | 2025, EIA-861 | 5,337,118 | 100% |
EIA's service-territory list for Collier County also names Lee County Electric Coop, Inc. These sell somewhere in the county; EIA does not say which neighborhoods.
Source: NREL and OpenEI, U.S. Electric Utility Companies and Rates, ZIP lookup, 2024 file. Average prices: EIA Form EIA-861, Sales to Ultimate Customers, 2025 unless the row names another year.
What do households in Golden Gate report paying for electricity?
The median household that pays its own electric bill in Golden Gate reports about $186 a month, 6% above the Florida median and 19% above the U.S. median. 7,794 households reported a bill, and 3% of households pay no separate electric bill.
Share of households by reported monthly electric bill, 2020-2024
Across Florida, the Census median runs 19% above EIA's average bill for the same years, and the two measure different things. Why they differ.
The median is estimated by interpolating inside the Census dollar brackets, so it is an estimate rather than a published figure. The bill figures cover 2020-2024; the utility prices above are for the year shown in each row.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year. U.S. row: the 51 state rows summed and re-interpolated.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
How many homes in Golden Gate heat with electricity?
91% of Golden Gate homes heat with electricity, 1 points above the Florida share and 50 points above the U.S. share. Gas heats 1% of homes.
| Area | Electricity | Gas | Other |
|---|---|---|---|
| Golden Gate | 91% | 1% | 8% |
| Florida | 90% | 6% | 3% |
| U.S. | 41% | 51% | 7% |
Source: U.S. Census Bureau, American Community Survey table B25040, 2020-2024 5-year.
How big is the electric bill against income in Golden Gate?
A year of the median bill comes to about $2,233, or roughly 3.3% of Golden Gate's median household income of $68,475, against 2.8% across Florida. This is an estimate: it divides twelve times a bracket-based median by a separate median, and both cover 2020-2024.
Source: U.S. Census Bureau, American Community Survey tables B25132 and B19013, 2020-2024 5-year.
What does it cost to run common appliances in Golden Gate?
A space heater at the usage below runs about $52.62 a month at FPL's average price of 14.62¢.
| Appliance | kWh a month | FPL 14.62¢, 2025 |
|---|---|---|
| Space heater | 360 | $52.62 |
| Central air conditioner | 193 | $28.24 |
| Electric water heater | 226 | $32.96 |
| Refrigerator | 51 | $7.51 |
| Clothes dryer | 57 | $8.29 |
| Television | 14 | $2.05 |
Source: Appliance wattage and hours on each appliance's page; prices as in the utility table above.
Which other cities are in Collier County?
Collier County also includes Immokalee, Naples, and Marco Island; Immokalee reports $163 a month against $186 here.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
What power plants are in Collier County?
2 power plants with 79 MW of capacity are in Collier County, the largest being Immokalee at 75 MW.
| Plant | Fuel | Capacity (MW) |
|---|---|---|
| Immokalee | Solar | 75 |
| Waste Management Naples LFGTE Project | Biomass | 4 |
Source: EIA Form EIA-860, 2025.