Minnesota electricity by city
Electric company in Mounds View, MN: $151 median bill
Xcel Energy is the electric company listed for ZIP codes in Mounds View (NREL and OpenEI, 2024), and households report a median bill of about $151 a month (Census ACS 2020-2024, estimated from reported brackets). That median is 12% above the Minnesota median.
Latest data: EIA 2025, Census 2020-2024; data loaded .
Who sells electricity in Mounds View?
One utility, Xcel Energy, appears in the ZIP codes that overlap Mounds View, at an average residential price of 17.07¢ in 2025.
| Utility | Type | Average price | Year and source | Residential customers | Share of city land |
|---|---|---|---|---|---|
| Xcel Energy | Investor-owned, full service | 17.07¢ | 2025, EIA-861 | 1,243,236 | 100% |
EIA's service-territory list for Ramsey County also names City of North St Paul, and Connexus Energy. These sell somewhere in the county; EIA does not say which neighborhoods.
Source: NREL and OpenEI, U.S. Electric Utility Companies and Rates, ZIP lookup, 2024 file. Average prices: EIA Form EIA-861, Sales to Ultimate Customers, 2025 unless the row names another year.
What do households in Mounds View report paying for electricity?
The median household that pays its own electric bill in Mounds View reports about $151 a month, 12% above the Minnesota median and 3% below the U.S. median. 5,162 households reported a bill, and 4% of households pay no separate electric bill.
Share of households by reported monthly electric bill, 2020-2024
Across Minnesota, the Census median runs 26% above EIA's average bill for the same years, and the two measure different things. Why they differ.
The median is estimated by interpolating inside the Census dollar brackets, so it is an estimate rather than a published figure. The bill figures cover 2020-2024; the utility prices above are for the year shown in each row.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year. U.S. row: the 51 state rows summed and re-interpolated.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
How many homes in Mounds View heat with electricity?
23% of Mounds View homes heat with electricity, 4 points above the Minnesota share and 18 points below the U.S. share. Gas heats 75% of homes.
| Area | Electricity | Gas | Other |
|---|---|---|---|
| Mounds View | 23% | 75% | 2% |
| Minnesota | 19% | 76% | 5% |
| U.S. | 41% | 51% | 7% |
Source: U.S. Census Bureau, American Community Survey table B25040, 2020-2024 5-year.
How big is the electric bill against income in Mounds View?
A year of the median bill comes to about $1,814, or roughly 2.0% of Mounds View's median household income of $90,009, against 1.8% across Minnesota. This is an estimate: it divides twelve times a bracket-based median by a separate median, and both cover 2020-2024.
Source: U.S. Census Bureau, American Community Survey tables B25132 and B19013, 2020-2024 5-year.
What does it cost to run common appliances in Mounds View?
A space heater at the usage below runs about $61.46 a month at Xcel Energy's average price of 17.07¢.
| Appliance | kWh a month | Xcel Energy 17.07¢, 2025 |
|---|---|---|
| Space heater | 360 | $61.46 |
| Central air conditioner | 193 | $32.98 |
| Electric water heater | 226 | $38.50 |
| Refrigerator | 51 | $8.78 |
| Clothes dryer | 57 | $9.68 |
| Television | 14 | $2.39 |
Source: Appliance wattage and hours on each appliance's page; prices as in the utility table above.
Which other cities are in Ramsey County?
Ramsey County also includes St. Paul, Maplewood, and Roseville; St. Paul reports $143 a month against $151 here.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
What power plants are in Ramsey County?
4 power plants with 701 MW of capacity are in Ramsey County, the largest being High Bridge at 644 MW.
| Plant | Fuel | Capacity (MW) |
|---|---|---|
| High Bridge | Natural gas | 644 |
| St Paul Cogeneration | Biomass | 37 |
| Twin Cities Hydro LLC | Hydro | 18 |
| MNDOT Standby Generation | Petroleum | 2 |
Source: EIA Form EIA-860, 2025.