California electricity by city
Electric company in Prunedale, CA: $182 median bill
In Prunedale, PG&E is the delivery company EIA lists for Monterey County (Form EIA-861, 2025), and homes on those wires can buy from the utility or from another seller. California homes paid 29.75¢ per kilowatt-hour on average in August 2026 (EIA), and households in Prunedale report a median bill of about $182 a month (Census ACS 2020-2024, estimated from reported brackets). The median bill in Prunedale is 27% above the Monterey County median of $144.
Latest data: EIA August 2026, Census 2020-2024; data loaded .
Who delivers and sells electricity in Prunedale?
PG&E's delivery charge averaged 24.60¢ per kWh in 2025, for delivery alone. EIA's list is by county, so which company reaches your address depends on where you live; your bill names it. These delivery prices are not what a home pays for electricity in full, and a seller's average price is not an offer.
| Utility | Type | Average price | Year and source | Residential customers | Share of city land |
|---|---|---|---|---|---|
| PG&E | Investor-owned, full service | 37.52¢ | 2025, EIA-861 | 1,738,444 | 97% |
EIA's service-territory list for Monterey County also names Central Coast Community Energy. These sell somewhere in the county; EIA does not say which neighborhoods.
Source: NREL and OpenEI, U.S. Electric Utility Companies and Rates, ZIP lookup, 2024 file. Average prices: EIA Form EIA-861, Sales to Ultimate Customers, 2025 unless the row names another year.
What do households in Prunedale report paying for electricity?
The median household that pays its own electric bill in Prunedale reports about $182 a month, 24% above the California median and 16% above the U.S. median. 5,491 households reported a bill, and 3% of households pay no separate electric bill.
Share of households by reported monthly electric bill, 2020-2024
Across California, the Census median runs 7% above EIA's average bill for the same years, and the two measure different things. Why they differ.
The median is estimated by interpolating inside the Census dollar brackets, so it is an estimate rather than a published figure. The bill figures cover 2020-2024; the utility prices above are for the year shown in each row.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year. U.S. row: the 51 state rows summed and re-interpolated.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
How many homes in Prunedale heat with electricity?
42% of Prunedale homes heat with electricity, 12 points above the California share and 1 points above the U.S. share. Gas heats 48% of homes.
| Area | Electricity | Gas | Other |
|---|---|---|---|
| Prunedale | 42% | 48% | 10% |
| California | 30% | 64% | 6% |
| U.S. | 41% | 51% | 7% |
Source: U.S. Census Bureau, American Community Survey table B25040, 2020-2024 5-year.
How big is the electric bill against income in Prunedale?
A year of the median bill comes to about $2,186, or roughly 2.1% of Prunedale's median household income of $103,819, against 1.8% across California. This is an estimate: it divides twelve times a bracket-based median by a separate median, and both cover 2020-2024.
Source: U.S. Census Bureau, American Community Survey tables B25132 and B19013, 2020-2024 5-year.
What does it cost to run common appliances in Prunedale?
A space heater at the usage below runs about $107.10 a month at the California average price of 29.75¢.
| Appliance | kWh a month | California average 29.75¢, 2026 |
|---|---|---|
| Space heater | 360 | $107.10 |
| Central air conditioner | 193 | $57.48 |
| Electric water heater | 226 | $67.09 |
| Refrigerator | 51 | $15.29 |
| Clothes dryer | 57 | $16.87 |
| Television | 14 | $4.17 |
Source: Appliance wattage and hours on each appliance's page; prices as in the utility table above.
Which other cities are in Monterey County?
Monterey County also includes Salinas, Seaside, and Monterey; Salinas reports $135 a month against $182 here.
Source: U.S. Census Bureau, American Community Survey table B25132, 2020-2024 5-year.
What power plants are in Monterey County?
25 power plants with 2,391 MW of capacity are in Monterey County, the largest being Dynegy Moss Landing Power Plant Hybrid at 1,848 MW.
| Plant | Fuel | Capacity (MW) |
|---|---|---|
| Dynegy Moss Landing Power Plant Hybrid | Natural gas | 1,848 |
| Elkhorn Battery Energy Storage System | Battery and pumped storage | 183 |
| King City Power Plant | Natural gas | 133 |
| Cal Flats BESS | Battery and pumped storage | 60 |
| King City Peaking | Natural gas | 47 |
| Salinas River Cogeneration | Natural gas | 39 |
| Sargent Canyon Cogeneration | Natural gas | 38 |
| Foundation Dole Fresh Vegetables | Wind | 6 |
Source: EIA Form EIA-860, 2025.