Wind power plant, California
85 B wind power plant, California
85 B is a 25.2 MW wind power plant in Kern County, California, operated by Wind Wall 1 LLC, and it generated 93,216 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 82nd percentile of U.S. wind plants. By 2025 generation it ranks 3,472nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the 85 B plant run compared with other wind plants?
The 85 B plant had a capacity factor of 42% in 2025 on 25.2 MW of net summer capacity, the 82nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 154 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| 85 B | 42% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the 85 B plant generating more or less than last year?
Generation at 85 B fell 4.5% from 2024 to 2025, from 97,633 MWh to 93,216 MWh.
| Period | MWh |
|---|---|
| 2024 | 97,633 |
| 2025 | 93,216 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 5,197 |
| November 2025 | 4,262 |
| October 2025 | 6,094 |
| September 2025 | 5,719 |
| August 2025 | 8,698 |
| July 2025 | 9,750 |
| June 2025 | 8,992 |
| May 2025 | 10,958 |
| April 2025 | 10,438 |
| March 2025 | 10,794 |
| February 2025 | 7,122 |
| January 2025 | 5,192 |
| December 2024 | 5,161 |
| November 2024 | 6,459 |
| October 2024 | 6,006 |
| September 2024 | 5,926 |
| August 2024 | 8,479 |
| July 2024 | 7,188 |
| June 2024 | 11,952 |
| May 2024 | 12,733 |
| April 2024 | 9,722 |
| March 2024 | 8,902 |
| February 2024 | 6,784 |
| January 2024 | 8,321 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the 85 B plant, and when do they retire?
1 operable generator totals 25.2 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 21.2 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 25 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MON2 | Operating | Onshore Wind Turbine | 25 | 2021 | n/a |
| WTGN | Retired | Onshore Wind Turbine | 21 | 1985 | 2019 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the 85 B plant?
EIA lists no joint owners for 85 B. Wind Wall 1 LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the 85 B plant?
85 B is in Tehachapi, Kern County, California, at 35.1026° N, 118.3325° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in California are similar in size?
California has 111 operable wind plants with 6,479 MW of capacity, and 85 B's 25.2 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Difwind Farms Ltd VI | Kern | 27 | 12,635 |
| AM Wind Repower | Riverside | 27 | 84,057 |
| Victory Garden (Tehachapi) | Kern | 26 | n/a |
| 85 B | Kern | 25 | 93,216 |
| CalPortland Company Mojave Wind | Kern | 24 | 24,360 |
| Mountain View III | Riverside | 22 | 80,725 |
| Voyager Wind IV | Kern | 22 | 78,747 |
Source: EIA Forms EIA-860 and EIA-923, 2025.