Wind power plant, Minnesota
Adams Wind Farm, Minnesota
Adams Wind Farm is a 23.3 MW wind power plant in Mower County, Minnesota, and it generated 2,980 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 9,727th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Adams Wind Farm plant run compared with other wind plants?
The Adams Wind Farm plant had a capacity factor of 1% in 2025 on 23.3 MW of net summer capacity, below nearly all of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 5 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Adams Wind Farm | 1% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Adams Wind Farm plant generating more or less than last year?
Generation at Adams Wind Farm fell 85.3% from 2024 to 2025, from 20,245 MWh to 2,980 MWh.
| Period | MWh |
|---|---|
| 2024 | 20,245 |
| 2025 | 2,980 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 0 |
| November 2025 | 0 |
| October 2025 | 0 |
| September 2025 | 0 |
| August 2025 | 0 |
| July 2025 | 0 |
| June 2025 | 0 |
| May 2025 | 24 |
| April 2025 | 518 |
| March 2025 | 815 |
| February 2025 | 692 |
| January 2025 | 931 |
| December 2024 | 664 |
| November 2024 | 1,112 |
| October 2024 | 1,307 |
| September 2024 | 865 |
| August 2024 | 909 |
| July 2024 | 762 |
| June 2024 | 1,575 |
| May 2024 | 2,264 |
| April 2024 | 3,573 |
| March 2024 | 3,304 |
| February 2024 | 2,640 |
| January 2024 | 1,270 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Adams Wind Farm plant, and when do they retire?
2 operable generators total 23.3 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 23 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 14 | 2003 | n/a |
| 2 | Operating | Onshore Wind Turbine | 10 | 2004 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Adams Wind Farm plant?
EIA lists no joint owners for Adams Wind Farm. Operator not shown. Form EIA-860 lists a private person here, and RateWatt does not publish personal names.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Adams Wind Farm plant?
Adams Wind Farm is in Adams, Mower County, Minnesota, at 43.5548° N, 92.7241° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Minnesota are similar in size?
Minnesota has 121 operable wind plants with 4,956 MW of capacity, and Adams Wind Farm's 23.3 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Community Wind South | Nobles | 30 | 87,927 |
| Ridgewind | Pipestone | 25 | 75,217 |
| Taconite Ridge 1 Wind Energy Center | St Louis | 25 | 53,103 |
| Adams Wind Farm | Mower | 23 | 2,980 |
| Ewington Energy Systems, LLC | Jackson | 23 | 81,428 |
| Grant County Wind LLC | Grant | 21 | 52,904 |
| Odin Wind Farm LLC | Cottonwood | 20 | 32,435 |
Source: EIA Forms EIA-860 and EIA-923, 2025.