Natural gas power plant, California
AES Huntington Beach Energy Project, California
AES Huntington Beach Energy Project is a 699 MW natural gas power plant in Orange County, California, operated by AES Huntington Beach Energy, LLC, and it generated 1,878,018 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in California, and its capacity factor sits at the 61st percentile of U.S. natural gas plants. By 2025 generation it ranks 528th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the AES Huntington Beach Energy Project plant run compared with other natural gas plants?
The AES Huntington Beach Energy Project plant had a capacity factor of 34% in 2025 on 630 MW of net summer capacity, the 61st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 124 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| AES Huntington Beach Energy Project | 34% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the AES Huntington Beach Energy Project plant generating more or less than last year?
Generation at AES Huntington Beach Energy Project fell 22.2% from 2024 to 2025, from 2,415,040 MWh to 1,878,018 MWh. Through August 2026 it is running 16.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 2,415,040 |
| 2025 | 1,878,018 |
| 2026 through August | 913,282 |
| 2025, same months | 1,091,691 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 336,883 |
| July 2026 | 187,588 |
| June 2026 | 0 |
| May 2026 | 55,524 |
| April 2026 | 58,556 |
| March 2026 | 90,152 |
| February 2026 | 118,226 |
| January 2026 | 66,353 |
| December 2025 | 70,641 |
| November 2025 | 244,078 |
| October 2025 | 222,206 |
| September 2025 | 249,402 |
| August 2025 | 277,426 |
| July 2025 | 155,215 |
| June 2025 | 73,869 |
| May 2025 | 138,579 |
| April 2025 | 58,796 |
| March 2025 | 88,684 |
| February 2025 | 130,044 |
| January 2025 | 169,078 |
| December 2024 | 202,900 |
| November 2024 | 318,368 |
| October 2024 | 260,637 |
| September 2024 | 271,064 |
| August 2024 | 328,067 |
| July 2024 | 324,901 |
| June 2024 | 92,240 |
| May 2024 | 26,859 |
| April 2024 | 82,963 |
| March 2024 | 21,401 |
| February 2024 | 135,039 |
| January 2024 | 350,601 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the AES Huntington Beach Energy Project plant, and when do they retire?
3 operable generators total 699 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 3 | 699 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1A | Operating | Natural Gas Fired Combined Cycle | 231 | 2020 | n/a |
| 1B | Operating | Natural Gas Fired Combined Cycle | 231 | 2020 | n/a |
| 1S | Operating | Natural Gas Fired Combined Cycle | 237 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the AES Huntington Beach Energy Project plant?
2 owners report shares in AES Huntington Beach Energy Project; AES Huntington Beach Energy, LLC holds the largest named share, 51.0% or about 357 MW. AES Huntington Beach Energy, LLC operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| AES Huntington Beach Energy, LLC | 51.0% | 357 | 957,789 |
| Ullico Infrastructure Southland Borrower LLC | 49.0% | 343 | 920,229 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the AES Huntington Beach Energy Project plant?
AES Huntington Beach Energy Project is in Huntington Beach, Orange County, California, at 33.6456° N, 117.9794° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and AES Huntington Beach Energy Project's 699 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pastoria Energy Facility, LLC | Kern | 779 | 3,620,488 |
| Colusa Generating Station | Colusa | 712 | 2,576,191 |
| Otay Mesa Generating Project | San Diego | 711 | 1,629,902 |
| AES Huntington Beach Energy Project | Orange | 699 | 1,878,018 |
| Valley (CA) | Los Angeles | 691 | 1,039,599 |
| Sunrise Power LLC | Kern | 685 | 1,809,308 |
| Los Medanos Energy Center | Contra Costa | 678 | 2,485,539 |
Source: EIA Forms EIA-860 and EIA-923, 2025.