Natural gas power plant, California

AES Huntington Beach Energy Project, California

AES Huntington Beach Energy Project is a 699 MW natural gas power plant in Orange County, California, operated by AES Huntington Beach Energy, LLC, and it generated 1,878,018 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in California, and its capacity factor sits at the 61st percentile of U.S. natural gas plants. By 2025 generation it ranks 528th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

699 MWNameplate capacity
34%Capacity factor, 2025, 61st percentile, on 630 MW net summer
0.9%Of CA generation, 2025
5 yearsAverage generator age, by MW

How hard does the AES Huntington Beach Energy Project plant run compared with other natural gas plants?

The AES Huntington Beach Energy Project plant had a capacity factor of 34% in 2025 on 630 MW of net summer capacity, the 61st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 124 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
AES Huntington Beach Energy Project34%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the AES Huntington Beach Energy Project plant generating more or less than last year?

Generation at AES Huntington Beach Energy Project fell 22.2% from 2024 to 2025, from 2,415,040 MWh to 1,878,018 MWh. Through August 2026 it is running 16.3% behind the same months of 2025.

Net generation by period
PeriodMWh
20242,415,040
20251,878,018
2026 through August913,282
2025, same months1,091,691
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026336,883
July 2026187,588
June 20260
May 202655,524
April 202658,556
March 202690,152
February 2026118,226
January 202666,353
December 202570,641
November 2025244,078
October 2025222,206
September 2025249,402
August 2025277,426
July 2025155,215
June 202573,869
May 2025138,579
April 202558,796
March 202588,684
February 2025130,044
January 2025169,078
December 2024202,900
November 2024318,368
October 2024260,637
September 2024271,064
August 2024328,067
July 2024324,901
June 202492,240
May 202426,859
April 202482,963
March 202421,401
February 2024135,039
January 2024350,601

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the AES Huntington Beach Energy Project plant?

AES Huntington Beach Energy Project made 0.9% of the 204,542,898 MWh reported by California plants in 2025, from 0.7% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 21st largest of 1,877 plants in California, the 489th largest of 14,327 in the U.S. and the 282nd largest of 1,962 natural gas plants. By 2025 generation it is the 16th largest of 1,608 generating plants in the state.

AES Huntington Beach Energy Project within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)699107,4330.7%
Generation (MWh)1,878,018204,542,8980.9%
Natural gas capacity (MW)69940,2111.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the AES Huntington Beach Energy Project plant, and when do they retire?

3 operable generators total 699 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s3699100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1AOperatingNatural Gas Fired Combined Cycle2312020n/a
1BOperatingNatural Gas Fired Combined Cycle2312020n/a
1SOperatingNatural Gas Fired Combined Cycle2372020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the AES Huntington Beach Energy Project plant?

2 owners report shares in AES Huntington Beach Energy Project; AES Huntington Beach Energy, LLC holds the largest named share, 51.0% or about 357 MW. AES Huntington Beach Energy, LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
AES Huntington Beach Energy, LLC51.0%357957,789
Ullico Infrastructure Southland Borrower LLC49.0%343920,229

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the AES Huntington Beach Energy Project plant?

AES Huntington Beach Energy Project is in Huntington Beach, Orange County, California, at 33.6456° N, 117.9794° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and AES Huntington Beach Energy Project's 699 MW is 2% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Pastoria Energy Facility, LLCKern7793,620,488
Colusa Generating StationColusa7122,576,191
Otay Mesa Generating ProjectSan Diego7111,629,902
AES Huntington Beach Energy ProjectOrange6991,878,018
Valley (CA)Los Angeles6911,039,599
Sunrise Power LLCKern6851,809,308
Los Medanos Energy CenterContra Costa6782,485,539

Source: EIA Forms EIA-860 and EIA-923, 2025.