Skip to main content
RateWatt

Biomass power plant, Arkansas

Ashdown biomass power plant, Arkansas

Ashdown is a 157 MW biomass power plant in Little River County, Arkansas, operated by Domtar Industries Inc, and it generated 587,038 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in Arkansas, and its capacity factor sits at the 42nd percentile of U.S. biomass plants. By 2025 generation it ranks 1,150th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

157 MWNameplate capacity
42%Capacity factor, 2025, 42nd percentile, on 128 MW net summer
0.9%Of AR generation, 2025
40 yearsAverage generator age, by MW

How hard does the Ashdown plant run compared with other biomass plants?

The Ashdown plant had a capacity factor of 42% in 2025 on 128 MW of net summer capacity, the 42nd percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 153 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ashdown42%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Ashdown plant generating more or less than last year?

Generation at Ashdown rose 2.6% from 2024 to 2025, from 572,130 MWh to 587,038 MWh. Through August 2026 it is running 1.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024572,130
2025587,038
2026 through August371,856
2025, same months378,977
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202652,834
July 202650,558
June 202646,632
May 202653,809
April 202640,253
March 202633,016
February 202652,236
January 202642,518
December 202549,378
November 202554,946
October 202553,855
September 202549,881
August 202548,512
July 202545,928
June 202551,482
May 202552,280
April 202540,253
March 202548,947
February 202550,356
January 202541,218
December 202450,552
November 202452,279
October 202440,135
September 202447,881
August 202442,882
July 202445,928
June 202450,214
May 202448,968
April 202447,503
March 202453,233
February 202449,169
January 202443,386

Source: EIA Form EIA-923, through August 2026.

How much of Arkansas' electricity comes from the Ashdown plant?

Ashdown made 0.9% of the 68,260,931 MWh reported by Arkansas plants in 2025, from 0.8% of the state's 18,819 MW of capacity. By capacity it is the 26th largest of 120 plants in Arkansas, the 1,923rd largest of 14,327 in the U.S. and the largest of 585 biomass plants. By 2025 generation it is the 14th largest of 114 generating plants in the state.

Ashdown within Arkansas, 2025
MeasureThis plantArkansasShare
Capacity (MW)15718,8190.8%
Generation (MWh)587,03868,260,9310.9%
Biomass capacity (MW)15727856.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ashdown plant, and when do they retire?

4 operable generators total 157 MW, with an average age of 40 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s12012%none reported
1970s14730%none reported
1990s29058%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingWood/Wood Waste Biomass201968n/a
GEN2OperatingWood/Wood Waste Biomass471979n/a
GEN3OperatingWood/Wood Waste Biomass451991n/a
GEN4OperatingWood/Wood Waste Biomass451991n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ashdown plant?

EIA lists no joint owners for Ashdown. Domtar Industries Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Ashdown plant?

Ashdown is in Ashdown, Little River County, Arkansas, at 33.6417° N, 94.1083° W. It sits in the Southwest Power Pool balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Arkansas are similar in size?

Arkansas has 5 operable biomass plants with 278 MW of capacity, and Ashdown's 157 MW is 56% of that.

Biomass plants in Arkansas around this size
PlantCountyMW2025 MWh
AshdownLittle River157469,998
Pine Bluff MillJefferson85n/a

Source: EIA Forms EIA-860 and EIA-923, 2025.