Wind power plant, Montana
Beaver Creek Wind Facility, Montana
Beaver Creek Wind Facility is a 248 MW wind power plant in Stillwater County, Montana, operated by Puget Sound Energy Inc, and it generated 161,324 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Montana, and its capacity factor sits at the 30th percentile of U.S. wind plants. By 2025 generation it ranks 2,796th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Beaver Creek Wind Facility plant run compared with other wind plants?
The Beaver Creek Wind Facility plant had a capacity factor of 27% in 2025 on 67.2 MW of net summer capacity, the 30th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 100 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Beaver Creek Wind Facility | 27% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Beaver Creek Wind Facility plant generating more or less than last year?
Beaver Creek Wind Facility generated 161,324 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 4285.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 161,324 |
| 2026 through August | 497,701 |
| 2025, same months | 11,348 |
Monthly generation, Aug 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 33,269 |
| July 2026 | 36,519 |
| June 2026 | 58,104 |
| May 2026 | 51,036 |
| April 2026 | 59,885 |
| March 2026 | 75,782 |
| February 2026 | 86,935 |
| January 2026 | 96,171 |
| December 2025 | 65,991 |
| November 2025 | 25,386 |
| October 2025 | 30,364 |
| September 2025 | 28,235 |
| August 2025 | 11,348 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Beaver Creek Wind Facility plant, and when do they retire?
1 operable generator totals 248 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 248 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BCW1 | Operating | Onshore Wind Turbine | 248 | 2025 | n/a |
| BCW1B | Postponed indefinitely | Batteries | 100 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Beaver Creek Wind Facility plant?
EIA lists no joint owners for Beaver Creek Wind Facility. Puget Sound Energy Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Puget Sound Energy Inc charge homes?
Puget Sound Energy Inc, the operator of Beaver Creek Wind Facility, had an average residential price of 17.01¢ per kWh and an average bill of $147 a month in 2025 in Washington.
| Measure | Price | Monthly bill | Against Montana |
|---|---|---|---|
| Puget Sound Energy Inc | 17.01¢ | $147 | other state |
| Montana average | 12.99¢ | $111 | |
| U.S. average | 17.23¢ | $151 | 33% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Beaver Creek Wind Facility plant?
Beaver Creek Wind Facility is in Big Timber, Stillwater County, Montana, at 45.9560° N, 109.4970° W. It sits in the NorthWestern Energy (NWMT) balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Montana are similar in size?
Montana has 23 operable wind plants with 2,147 MW of capacity, and Beaver Creek Wind Facility's 248 MW is 12% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Clearwater Wind I | Rosebud | 366 | 1,328,889 |
| Beaver Creek Wind Facility | Stillwater | 248 | 161,324 |
| Pryor Mountain Wind | Carbon | 240 | 750,811 |
| Clearwater Wind East | Custer | 208 | 830,411 |
| NaturEner Rim Rock Energy | Toole | 189 | 525,495 |
Source: EIA Forms EIA-860 and EIA-923, 2025.