Bennetts Bridge hydroelectric power plant, New York

Bennetts Bridge is a 36 MW hydro power plant in Oswego County, New York, operated by Erie Boulevard Hydropower LP, and it generated 90,412 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in New York, and its capacity factor sits at the 52nd percentile of U.S. hydro plants. By 2025 generation it ranks 3,501st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

36 MWNameplate capacity
34%Capacity factor, 2025, 52nd percentile, on 30.3 MW net summer
0.1%Of NY generation, 2025
76 yearsAverage generator age, by MW

How hard does the Bennetts Bridge plant run compared with other hydro plants?

The Bennetts Bridge plant had a capacity factor of 34% in 2025 on 30.3 MW of net summer capacity, the 52nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 124 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bennetts Bridge34%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bennetts Bridge plant generating more or less than last year?

Generation at Bennetts Bridge rose 18.5% from 2024 to 2025, from 76,293 MWh to 90,412 MWh.

Net generation by period
PeriodMWh
202476,293
202590,412
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20257,186
November 202511,238
October 20252,124
September 20251,928
August 20252,839
July 20253,829
June 20258,035
May 202510,394
April 202514,621
March 202514,359
February 20254,537
January 20259,322
December 20246,485
November 20243,198
October 20244,236
September 20243,619
August 20243,423
July 20245,158
June 20243,988
May 20245,521
April 202410,839
March 202410,461
February 20249,561
January 20249,804

Source: EIA Form EIA-923, through August 2026.

How much of New York's electricity comes from the Bennetts Bridge plant?

Bennetts Bridge made 0.1% of the 130,607,810 MWh reported by New York plants in 2025, from 0.1% of the state's 44,194 MW of capacity. By capacity it is the 124th largest of 1,145 plants in New York, the 4,210th largest of 14,327 in the U.S. and the 335th largest of 1,393 hydro plants. By 2025 generation it is the 93rd largest of 1,049 generating plants in the state.

Bennetts Bridge within New York, 2025
MeasureThis plantNew YorkShare
Capacity (MW)3644,1940.1%
Generation (MWh)90,412130,607,8100.1%
Hydro capacity (MW)364,6830.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bennetts Bridge plant, and when do they retire?

4 operable generators total 36 MW, with an average age of 76 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1930s21850%none reported
1960s21850%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric91932n/a
2OperatingConventional Hydroelectric91932n/a
3OperatingConventional Hydroelectric91966n/a
4OperatingConventional Hydroelectric91966n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bennetts Bridge plant?

EIA lists no joint owners for Bennetts Bridge. Erie Boulevard Hydropower LP operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Bennetts Bridge plant?

Bennetts Bridge is in Altmar, Oswego County, New York, at 43.5317° N, 75.9531° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in New York are similar in size?

New York has 163 operable hydro plants with 4,683 MW of capacity, and Bennetts Bridge's 36 MW is 1% of that.

Hydro plants in New York around this size
PlantCountyMW2025 MWh
School StreetAlbany39146,124
Stewarts BridgeSaratoga3990,410
Sherman IslandSaratoga36139,201
Bennetts BridgeOswego3690,412
Glen Park Hydroelectric ProjectJefferson3372,380
ColtonSt Lawrence30154,165
StarkSt Lawrence2678,819

Source: EIA Forms EIA-860 and EIA-923, 2025.