Wind power plant, Illinois
Bennington Wind power plant, Illinois
Bennington Wind is a 93 MW wind power plant in Marshall County, Illinois, operated by Minonk Stewardship Wind LLC, and it generated 303,934 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Illinois, and its capacity factor sits at the 64th percentile of U.S. wind plants. By 2025 generation it ranks 1,954th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Bennington Wind plant run compared with other wind plants?
The Bennington Wind plant had a capacity factor of 37% in 2025 on 93 MW of net summer capacity, the 64th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 136 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Bennington Wind | 37% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Bennington Wind plant generating more or less than last year?
Generation at Bennington Wind fell 0.2% from 2024 to 2025, from 304,408 MWh to 303,934 MWh. Through August 2026 it is running 2.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 304,408 |
| 2025 | 303,934 |
| 2026 through August | 209,200 |
| 2025, same months | 204,760 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 12,438 |
| July 2026 | 9,383 |
| June 2026 | 22,115 |
| May 2026 | 24,536 |
| April 2026 | 36,128 |
| March 2026 | 39,546 |
| February 2026 | 29,347 |
| January 2026 | 35,707 |
| December 2025 | 34,210 |
| November 2025 | 25,268 |
| October 2025 | 27,300 |
| September 2025 | 12,396 |
| August 2025 | 12,411 |
| July 2025 | 9,682 |
| June 2025 | 13,617 |
| May 2025 | 18,918 |
| April 2025 | 35,890 |
| March 2025 | 45,439 |
| February 2025 | 33,501 |
| January 2025 | 35,302 |
| December 2024 | 29,839 |
| November 2024 | 27,779 |
| October 2024 | 28,557 |
| September 2024 | 14,103 |
| August 2024 | 13,136 |
| July 2024 | 10,778 |
| June 2024 | 24,004 |
| May 2024 | 24,822 |
| April 2024 | 36,069 |
| March 2024 | 38,645 |
| February 2024 | 30,497 |
| January 2024 | 26,179 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Bennington Wind plant, and when do they retire?
1 operable generator totals 93 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 93 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BENN | Operating | Onshore Wind Turbine | 93 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Bennington Wind plant?
EIA lists no joint owners for Bennington Wind. Minonk Stewardship Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Bennington Wind plant?
Bennington Wind is in Minonk, Marshall County, Illinois, at 40.9604° N, 89.0854° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Illinois are similar in size?
Illinois has 55 operable wind plants with 8,458 MW of capacity, and Bennington Wind's 93 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| EcoGrove Wind LLC | Stephenson | 101 | 251,054 |
| Rail Splitter Wind Farm | Tazewell | 101 | 269,234 |
| Hoopeston Wind LLC | Vermilion | 98 | 337,742 |
| Bennington Wind | Marshall | 93 | 303,934 |
| Bishop Hill II Wind Farm | Henry | 81 | 334,384 |
| GSG LLC | Lee | 80 | 312,297 |
| Lone Tree Wind, LLC | Bureau | 79 | 279,231 |
Source: EIA Forms EIA-860 and EIA-923, 2025.