Skip to main content
RateWatt

Petroleum power plant, Vermont

Berlin 5 petroleum power plant, Vermont

Berlin 5 is a 41.8 MW petroleum power plant in Washington County, Vermont, operated by Green Mountain Power Corp, and it generated 1,371 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Vermont, and its capacity factor sits at the 45th percentile of U.S. petroleum plants. By 2025 generation it ranks 11,602nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

41.8 MWNameplate capacity
under 1%Capacity factor, 2025, 45th percentile, on 35 MW net summer
0.1%Of VT generation, 2025
53 yearsAverage generator age, by MW

How hard does the Berlin 5 plant run compared with other petroleum plants?

The Berlin 5 plant had a capacity factor of under 1% in 2025 on 35 MW of net summer capacity, the 45th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Berlin 5under 1%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Berlin 5 plant generating more or less than last year?

Berlin 5 generated 1,371 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 12.3% ahead of the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024903
20251,371
2026 through August1,049
2025, same months934
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026106
July 2026143
June 202654
May 2026120
April 202698
March 20260
February 20260
January 2026528
December 20250
November 2025230
October 2025181
September 202526
August 202591
July 2025161
June 2025497
May 202548
April 202525
March 202555
February 202557
January 20250
December 20240
November 202426
October 202499
September 202424
August 2024149
July 2024499
June 202411
May 20247
April 20240
March 202418
February 202470
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of Vermont's electricity comes from the Berlin 5 plant?

Berlin 5 made 0.1% of the 2,033,030 MWh reported by Vermont plants in 2025, from 4.6% of the state's 899 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 4th largest of 117 plants in Vermont, the 4,048th largest of 14,327 in the U.S. and the 110th largest of 861 petroleum plants. By 2025 generation it is the 103rd largest of 114 generating plants in the state.

Berlin 5 within Vermont, 2025
MeasureThis plantVermontShare
Capacity (MW)428994.6%
Generation (MWh)1,3712,033,0300.1%
Petroleum capacity (MW)4214628.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Berlin 5 plant, and when do they retire?

1 operable generator totals 41.8 MW, with an average age of 53 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s142100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GT1OperatingPetroleum Liquids421972n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Berlin 5 plant?

EIA lists no joint owners for Berlin 5. Green Mountain Power Corp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Green Mountain Power Corp charge homes?

Green Mountain Power Corp, the operator of Berlin 5, had an average residential price of 23.29¢ per kWh and an average bill of $140 a month in 2025, 2% above the Vermont average of 22.79¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Vermont
Green Mountain Power Corp23.29¢$1402% higher
Vermont average22.79¢$135
U.S. average17.23¢$15124% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Berlin 5 plant?

Berlin 5 is in Berlin, Washington County, Vermont, at 44.2510° N, 72.6027° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in Vermont are similar in size?

Vermont has 5 operable petroleum plants with 146 MW of capacity, and Berlin 5's 41.8 MW is 29% of that.

Petroleum plants in Vermont around this size
PlantCountyMW2025 MWh
VPPSA Project 10Franklin471,250
Berlin 5Washington421,371
Burlington GTChittenden26684

Source: EIA Forms EIA-860 and EIA-923, 2025.