Skip to main content
RateWatt

Hydro power plant, New Hampshire

Berlin Gorham hydroelectric power plant, New Hampshire

Berlin Gorham is a 44.3 MW power plant, 30.3 MW of it hydro, in Coos County, New Hampshire, operated by Great Lakes Hydro America LLC, and it generated 101,103 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in New Hampshire, and its capacity factor sits at the 63rd percentile of U.S. hydro plants. By 2025 generation it ranks 3,379th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

44.3 MWNameplate capacity
39%Capacity factor, 2025, hydro units, 63rd percentile, on 30.4 MW net summer
0.5%Of NH generation, 2025
69 yearsAverage generator age, by MW

How hard does the Berlin Gorham plant run compared with other hydro plants?

The Berlin Gorham plant's hydro units had a capacity factor of 39% in 2025 on 30.4 MW of net summer capacity, the 63rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 141 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Berlin Gorham39%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its hydro generators only. Values above 105% are left out of the comparison.

Is the Berlin Gorham plant generating more or less than last year?

Generation at Berlin Gorham fell 24.3% from 2024 to 2025, from 133,480 MWh to 101,103 MWh.

Net generation by period
PeriodMWh
2024133,480
2025101,103
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20255,895
November 20255,012
October 20254,282
September 20254,715
August 20255,359
July 202510,040
June 20258,915
May 202511,495
April 202511,774
March 202512,057
February 20259,230
January 202512,329
December 20249,545
November 20245,578
October 20246,244
September 20249,903
August 202413,685
July 202413,689
June 202411,088
May 202412,749
April 202413,940
March 202412,482
February 202411,189
January 202413,388

Source: EIA Form EIA-923, through August 2026.

How much of New Hampshire's electricity comes from the Berlin Gorham plant?

Berlin Gorham made 0.5% of the 19,112,246 MWh reported by New Hampshire plants in 2025, from 1.0% of the state's 4,582 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 11th largest of 61 plants in New Hampshire, the 3,996th largest of 14,327 in the U.S. and the 363rd largest of 1,393 hydro plants on its hydro units alone. By 2025 generation it is the 12th largest of 57 generating plants in the state.

Berlin Gorham within New Hampshire, 2025
MeasureThis plantNew HampshireShare
Capacity (MW)444,5821.0%
Generation (MWh)101,10319,112,2460.5%
Hydro capacity (MW)305165.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Berlin Gorham plant, and when do they retire?

22 operable generators total 44.3 MW, with an average age of 69 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1910s51022%none reported
1920s121840%none reported
1980s437%none reported
2020s11432%none reported
Every generator, 22 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CAS1OperatingConventional Hydroelectric21914n/a
CAS2OperatingConventional Hydroelectric21916n/a
SH2OperatingConventional Hydroelectric11916n/a
SHL1OperatingConventional Hydroelectric11916n/a
CAS3OperatingConventional Hydroelectric31918n/a
GOR1OperatingConventional Hydroelectric11920n/a
GOR2OperatingConventional Hydroelectric11920n/a
GOR3OperatingConventional Hydroelectric11920n/a
GOR4OperatingConventional Hydroelectric11920n/a
RS1OperatingConventional Hydroelectric41920n/a
RS3OperatingConventional Hydroelectric41920n/a
XP1OperatingConventional Hydroelectric11921n/a
XP2OperatingConventional Hydroelectric11921n/a
XP3OperatingConventional Hydroelectric11921n/a
XP4OperatingConventional Hydroelectric11921n/a
XP5OperatingConventional Hydroelectric11924n/a
SHL3OperatingConventional Hydroelectric21929n/a
SM1OperatingConventional Hydroelectric11980n/a
SM2OperatingConventional Hydroelectric11980n/a
SM3OperatingConventional Hydroelectric11980n/a
SM4OperatingConventional Hydroelectric11980n/a
BESS1OperatingBatteries142023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Berlin Gorham plant?

EIA lists no joint owners for Berlin Gorham. Great Lakes Hydro America LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Berlin Gorham plant use?

Berlin Gorham has capacity on 2 fuels: 68% hydro and 32% battery and pumped storage. In 2025, hydro made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Hydro3068.4%102,644
Battery and pumped storage1431.6%-1,541

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Berlin Gorham plant?

Berlin Gorham is in Berlin, Coos County, New Hampshire, at 44.3889° N, 71.1645° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in New Hampshire are similar in size?

New Hampshire has 32 operable hydro plants with 516 MW of capacity, and Berlin Gorham's 30.3 MW is 6% of that.

Hydro plants in New Hampshire around this size
PlantCountyMW2025 MWh
Berlin GorhamCoos30102,644
AmoskeagHillsborough1664,854