Skip to main content
RateWatt

Wind power plant, Michigan

Big Turtle Wind Farm 2 power plant, Michigan

Big Turtle Wind Farm 2 is a 29.4 MW wind power plant in Huron County, Michigan, operated by DTE Electric Company, and it generated 103,793 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Michigan, and its capacity factor sits at the 74th percentile of U.S. wind plants. By 2025 generation it ranks 3,351st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

29.4 MWNameplate capacity
40%Capacity factor, 2025, 74th percentile, on 29.4 MW net summer
0.1%Of MI generation, 2025
9 yearsAverage generator age, by MW

How hard does the Big Turtle Wind Farm 2 plant run compared with other wind plants?

The Big Turtle Wind Farm 2 plant had a capacity factor of 40% in 2025 on 29.4 MW of net summer capacity, the 74th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 147 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Big Turtle Wind Farm 240%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Big Turtle Wind Farm 2 plant generating more or less than last year?

Generation at Big Turtle Wind Farm 2 fell 3.0% from 2024 to 2025, from 106,948 MWh to 103,793 MWh.

Net generation by period
PeriodMWh
2024106,948
2025103,793
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202511,200
November 202511,429
October 20257,474
September 20253,992
August 20255,320
July 20254,518
June 20256,891
May 20258,958
April 20259,790
March 202511,765
February 20258,877
January 202513,579
December 202412,150
November 202411,173
October 202410,899
September 20245,959
August 20244,838
July 20244,084
June 20247,866
May 20247,172
April 202410,741
March 202411,938
February 20249,764
January 202410,364

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from the Big Turtle Wind Farm 2 plant?

Big Turtle Wind Farm 2 made 0.1% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.1% of the state's 34,725 MW of capacity. By capacity it is the 97th largest of 283 plants in Michigan, the 4,423rd largest of 14,327 in the U.S. and the 966th largest of 1,358 wind plants. By 2025 generation it is the 80th largest of 261 generating plants in the state.

Big Turtle Wind Farm 2 within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)2934,7250.1%
Generation (MWh)103,793127,929,4980.1%
Wind capacity (MW)293,7770.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Big Turtle Wind Farm 2 plant, and when do they retire?

1 operable generator totals 29.4 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s129100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BTWF2OperatingOnshore Wind Turbine292016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Big Turtle Wind Farm 2 plant?

EIA lists no joint owners for Big Turtle Wind Farm 2. DTE Electric Company operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does DTE Electric Company charge homes?

DTE Electric Company, the operator of Big Turtle Wind Farm 2, had an average residential price of 20.25¢ per kWh and an average bill of $126 a month in 2025, 1% above the Michigan average of 20.03¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Michigan
DTE Electric Company20.25¢$1261% higher
Michigan average20.03¢$127
U.S. average17.23¢$15114% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Big Turtle Wind Farm 2 plant?

Big Turtle Wind Farm 2 is in Harbor Beach, Huron County, Michigan, at 43.9196° N, 82.7944° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Michigan are similar in size?

Michigan has 34 operable wind plants with 3,777 MW of capacity, and Big Turtle Wind Farm 2's 29.4 MW is 1% of that.

Wind plants in Michigan around this size
PlantCountyMW2025 MWh
HarvestHuron53116,570
Beebe 1BGratiot50126,533
Minden Wind ParkSanilac32111,783
Big Turtle Wind Farm 2Huron29103,793
Heritage Garden Wind Farm I LLCDelta2871,016
Big Turtle Wind Farm, LLCHuron2075,599

Source: EIA Forms EIA-860 and EIA-923, 2025.