Bison 4 Wind Energy Center, North Dakota

Bison 4 Wind Energy Center is a 205 MW wind power plant in Morton County, North Dakota, operated by ALLETE, Inc., and it generated 572,919 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.3% of the generation reported in North Dakota, and its capacity factor sits at the 48th percentile of U.S. wind plants. By 2025 generation it ranks 1,180th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

205 MWNameplate capacity
32%Capacity factor, 2025, 48th percentile, on 202 MW net summer
1.3%Of ND generation, 2025
10 yearsAverage generator age, by MW

How hard does the Bison 4 Wind Energy Center plant run compared with other wind plants?

The Bison 4 Wind Energy Center plant had a capacity factor of 32% in 2025 on 202 MW of net summer capacity, the 48th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 118 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bison 4 Wind Energy Center32%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bison 4 Wind Energy Center plant generating more or less than last year?

Generation at Bison 4 Wind Energy Center fell 8.2% from 2024 to 2025, from 624,234 MWh to 572,919 MWh.

Net generation by period
PeriodMWh
2024624,234
2025572,919
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202548,264
November 202552,283
October 202563,998
September 202534,931
August 202520,343
July 202537,847
June 202529,723
May 202554,567
April 202544,091
March 202552,575
February 202552,057
January 202582,240
December 202456,297
November 202454,336
October 202455,481
September 202462,091
August 202457,232
July 202433,709
June 202455,564
May 202456,180
April 202475,758
March 202448,632
February 202445,333
January 202423,621

Source: EIA Form EIA-923, through August 2026.

How much of North Dakota's electricity comes from the Bison 4 Wind Energy Center plant?

Bison 4 Wind Energy Center made 1.3% of the 42,873,330 MWh reported by North Dakota plants in 2025, from 1.9% of the state's 10,973 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 10th largest of 62 plants in North Dakota, the 1,462nd largest of 14,327 in the U.S. and the 227th largest of 1,358 wind plants. By 2025 generation it is the 18th largest of 57 generating plants in the state.

Bison 4 Wind Energy Center within North Dakota, 2025
MeasureThis plantNorth DakotaShare
Capacity (MW)20510,9731.9%
Generation (MWh)572,91942,873,3301.3%
Wind capacity (MW)2054,7294.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bison 4 Wind Energy Center plant, and when do they retire?

1 operable generator totals 205 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1205100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BISO4OperatingOnshore Wind Turbine2052015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bison 4 Wind Energy Center plant?

EIA lists no joint owners for Bison 4 Wind Energy Center. ALLETE, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does ALLETE, Inc. charge homes?

ALLETE, Inc., the operator of Bison 4 Wind Energy Center, had an average residential price of 15.86¢ per kWh and an average bill of $107 a month in 2025 in Minnesota.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst North Dakota
ALLETE, Inc.15.86¢$107other state
North Dakota average11.82¢$126
U.S. average17.23¢$15146% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Bison 4 Wind Energy Center plant?

Bison 4 Wind Energy Center is in New Salem, Morton County, North Dakota, at 46.9800° N, 101.5547° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in North Dakota are similar in size?

North Dakota has 41 operable wind plants with 4,729 MW of capacity, and Bison 4 Wind Energy Center's 205 MW is 4% of that.

Wind plants in North Dakota around this size
PlantCountyMW2025 MWh
Aurora Wind ProjectWilliams299912,751
Bison 4 Wind Energy CenterMorton205572,919
Courtenay Wind FarmStutsman200422,952
Emmons-Logan Wind, LLCEmmons200877,247
Bowman WindBowman200118,335

Source: EIA Forms EIA-860 and EIA-923, 2025.