Solar power plant, South Carolina
Blackville Solar II power plant, South Carolina
Blackville Solar II is a 20 MW solar power plant in Barnwell County, South Carolina, operated by DP-C2 Episode 1 LLC, and it generated 37,033 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 33rd percentile of U.S. solar plants. By 2025 generation it ranks 4,464th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Blackville Solar II plant run compared with other solar plants?
The Blackville Solar II plant had a capacity factor of 21% in 2025 on 20 MW of net summer capacity, the 33rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Blackville Solar II | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Blackville Solar II plant generating more or less than last year?
Generation at Blackville Solar II rose 19.1% from 2024 to 2025, from 31,094 MWh to 37,033 MWh.
| Period | MWh |
|---|---|
| 2024 | 31,094 |
| 2025 | 37,033 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,724 |
| November 2025 | 2,313 |
| October 2025 | 2,293 |
| September 2025 | 3,179 |
| August 2025 | 2,771 |
| July 2025 | 4,154 |
| June 2025 | 4,021 |
| May 2025 | 3,435 |
| April 2025 | 3,901 |
| March 2025 | 4,095 |
| February 2025 | 2,748 |
| January 2025 | 2,399 |
| December 2024 | 1,894 |
| November 2024 | 1,818 |
| October 2024 | 1,947 |
| September 2024 | 1,907 |
| August 2024 | 3,397 |
| July 2024 | 3,864 |
| June 2024 | 3,670 |
| May 2024 | 3,420 |
| April 2024 | 3,675 |
| March 2024 | 2,774 |
| February 2024 | 1,992 |
| January 2024 | 736 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Blackville Solar II plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| C2BV | Operating | Solar Photovoltaic | 20 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Blackville Solar II plant?
EIA lists no joint owners for Blackville Solar II. DP-C2 Episode 1 LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Blackville Solar II plant?
Blackville Solar II is in Blackville, Barnwell County, South Carolina, at 33.3443° N, 81.2618° W. It sits in the Dominion Energy South Carolina balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in South Carolina are similar in size?
South Carolina has 126 operable solar plants with 1,956 MW of capacity, and Blackville Solar II's 20 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Cameron Solar | Calhoun | 20 | 38,139 |
| Estill Solar | Hampton | 20 | 23,657 |
| Hampton Solar 2 | Hampton | 20 | 41,420 |
| Blackville Solar II | Barnwell | 20 | 37,033 |
| Pinson Solar Farm | Spartanburg | 20 | 30,062 |
| Bishopville Solar, LLC | Lee | 20 | 0 |
| Midway Green Solar | Union | 13 | 20,483 |
Source: EIA Forms EIA-860 and EIA-923, 2025.