Wind power plant, Rhode Island
Block Island Wind Farm, Rhode Island
Block Island Wind Farm is a 30 MW wind power plant in Washington County, Rhode Island, operated by Deepwater Wind Block Island LLC, and it generated 87,371 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in Rhode Island, and its capacity factor sits at the 54th percentile of U.S. wind plants. By 2025 generation it ranks 3,553rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Block Island Wind Farm plant run compared with other wind plants?
The Block Island Wind Farm plant had a capacity factor of 34% in 2025 on 29.3 MW of net summer capacity, the 54th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 124 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Block Island Wind Farm | 34% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Block Island Wind Farm plant generating more or less than last year?
Generation at Block Island Wind Farm fell 6.7% from 2024 to 2025, from 93,649 MWh to 87,371 MWh. Through August 2026 it is running 10.5% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 93,649 |
| 2025 | 87,371 |
| 2026 through August | 51,742 |
| 2025, same months | 57,784 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 3,114 |
| July 2026 | 3,715 |
| June 2026 | 3,714 |
| May 2026 | 5,687 |
| April 2026 | 6,712 |
| March 2026 | 9,423 |
| February 2026 | 7,302 |
| January 2026 | 12,075 |
| December 2025 | 11,735 |
| November 2025 | 7,200 |
| October 2025 | 7,025 |
| September 2025 | 3,627 |
| August 2025 | 3,128 |
| July 2025 | 3,743 |
| June 2025 | 5,036 |
| May 2025 | 9,792 |
| April 2025 | 10,403 |
| March 2025 | 8,390 |
| February 2025 | 8,649 |
| January 2025 | 8,643 |
| December 2024 | 9,252 |
| November 2024 | 8,533 |
| October 2024 | 5,601 |
| September 2024 | 5,592 |
| August 2024 | 4,676 |
| July 2024 | 5,002 |
| June 2024 | 7,268 |
| May 2024 | 8,667 |
| April 2024 | 7,510 |
| March 2024 | 10,865 |
| February 2024 | 8,640 |
| January 2024 | 12,043 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Block Island Wind Farm plant, and when do they retire?
1 operable generator totals 30 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 30 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BIWF | Operating | Offshore Wind Turbine | 30 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Block Island Wind Farm plant?
EIA lists no joint owners for Block Island Wind Farm. Deepwater Wind Block Island LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Block Island Wind Farm plant?
Block Island Wind Farm is in NA, Washington County, Rhode Island, at 41.1147° N, 71.5211° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.