Blundell is a 38.1 MW geothermal power plant in Beaver County, Utah, operated by PacifiCorp, and it generated 271,209 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Utah, and its capacity factor sits at the 92nd percentile of U.S. geothermal plants. By 2025 generation it ranks 2,104th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

38.1 MWNameplate capacity
98%Capacity factor, 2025, 92nd percentile, on 31.7 MW net summer
0.7%Of UT generation, 2025
34 yearsAverage generator age, by MW

How hard does the Blundell plant run compared with other geothermal plants?

The Blundell plant had a capacity factor of 98% in 2025 on 31.7 MW of net summer capacity, the 92nd percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 356 days at full output out of 365.

0%Shaded: the middle half of geothermal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blundell98%
Geothermal plants, 75th percentile81%
Geothermal plants, median66%
Geothermal plants, 25th percentile51%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blundell plant generating more or less than last year?

Generation at Blundell fell 0.5% from 2024 to 2025, from 272,457 MWh to 271,209 MWh.

Net generation by period
PeriodMWh
2024272,457
2025271,209
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202524,085
November 202524,756
October 202522,759
September 202515,147
August 202522,035
July 202522,359
June 202521,785
May 202522,947
April 202523,444
March 202524,691
February 202522,077
January 202525,124
December 202424,394
November 202423,551
October 202424,278
September 202418,192
August 202420,333
July 202421,185
June 202422,028
May 202422,407
April 202422,669
March 202425,250
February 202423,519
January 202424,651

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Blundell plant?

Blundell made 0.7% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.3% of the state's 11,140 MW of capacity. Its share of output is 2.1 times its share of capacity. By capacity it is the 48th largest of 126 plants in Utah, the 4,166th largest of 14,327 in the U.S. and the 31st largest of 66 geothermal plants. By 2025 generation it is the 14th largest of 117 generating plants in the state.

Blundell within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)3811,1400.3%
Generation (MWh)271,20938,124,6790.7%
Geothermal capacity (MW)387749.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blundell plant, and when do they retire?

2 operable generators total 38.1 MW, with an average age of 34 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s12669%none reported
2000s11231%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingGeothermal261984n/a
2OperatingGeothermal122007n/a
3CancelledGeothermal30n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blundell plant?

EIA lists no joint owners for Blundell. PacifiCorp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PacifiCorp charge homes?

PacifiCorp, the operator of Blundell, had an average residential price of 13.52¢ per kWh and an average bill of $101 a month in 2025, 4% above the Utah average of 13.02¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Utah
PacifiCorp13.52¢$1014% higher
Utah average13.02¢$99
U.S. average17.23¢$15132% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Blundell plant?

Blundell is in Milford, Beaver County, Utah, at 38.4889° N, 112.8533° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which geothermal plants in Utah are similar in size?

Utah has 3 operable geothermal plants with 77.1 MW of capacity, and Blundell's 38.1 MW is 49% of that.

Geothermal plants in Utah around this size
PlantCountyMW2025 MWh
BlundellBeaver38271,209
Cove FortBeaver25142,142