Natural gas power plant, Georgia

Bobby C Smith Jr Energy Facility, Georgia

Bobby C Smith Jr Energy Facility is a 597 MW natural gas power plant in Effingham County, Georgia, operated by Oglethorpe Power Corporation, and it generated 3,193,378 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.2% of the generation reported in Georgia, and its capacity factor sits at the 85th percentile of U.S. natural gas plants. By 2025 generation it ranks 370th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

597 MWNameplate capacity
69%Capacity factor, 2025, 85th percentile, on 525 MW net summer
2.2%Of GA generation, 2025
22 yearsAverage generator age, by MW

How hard does the Bobby C Smith Jr Energy Facility plant run compared with other natural gas plants?

The Bobby C Smith Jr Energy Facility plant had a capacity factor of 69% in 2025 on 525 MW of net summer capacity, the 85th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 254 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bobby C Smith Jr Energy Facility69%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bobby C Smith Jr Energy Facility plant generating more or less than last year?

Bobby C Smith Jr Energy Facility generated 3,193,378 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.5% ahead of the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
20241,650,261
20253,193,378
2026 through August2,332,574
2025, same months2,170,578
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026356,483
July 2026361,995
June 2026317,512
May 2026309,316
April 2026291,512
March 2026287,832
February 2026182,002
January 2026225,922
December 2025252,286
November 2025250,299
October 2025195,799
September 2025324,416
August 2025332,283
July 2025361,290
June 2025328,679
May 2025341,146
April 2025344,900
March 2025199,766
February 2025100,256
January 2025162,258
December 2024116,431
November 2024215,812
October 2024192,364
September 2024317,628
August 2024357,881
July 2024286,726
June 202431,662
May 20240
April 20240
March 20240
February 202437,441
January 202494,316

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Bobby C Smith Jr Energy Facility plant?

Bobby C Smith Jr Energy Facility made 2.2% of the 144,967,352 MWh reported by Georgia plants in 2025, from 1.4% of the state's 42,719 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 19th largest of 263 plants in Georgia, the 616th largest of 14,327 in the U.S. and the 378th largest of 1,962 natural gas plants. By 2025 generation it is the 10th largest of 242 generating plants in the state.

Bobby C Smith Jr Energy Facility within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)59742,7191.4%
Generation (MWh)3,193,378144,967,3522.2%
Natural gas capacity (MW)59718,4663.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bobby C Smith Jr Energy Facility plant, and when do they retire?

3 operable generators total 597 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3597100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
STGOperatingNatural Gas Fired Combined Cycle1982003n/a
UNT1OperatingNatural Gas Fired Combined Cycle1992003n/a
UNT2OperatingNatural Gas Fired Combined Cycle1992003n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bobby C Smith Jr Energy Facility plant?

EIA lists no joint owners for Bobby C Smith Jr Energy Facility. Oglethorpe Power Corporation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Bobby C Smith Jr Energy Facility plant?

Bobby C Smith Jr Energy Facility is in Rincon, Effingham County, Georgia, at 32.2773° N, 81.2844° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Georgia are similar in size?

Georgia has 30 operable natural gas plants with 18,466 MW of capacity, and Bobby C Smith Jr Energy Facility's 597 MW is 3% of that.

Natural gas plants in Georgia around this size
PlantCountyMW2025 MWh
Talbot County EnergyTalbot726399,690
Edward L. Addison Generating PlantUpson701304,073
AL Sandersville LLCWashington692326,170
Bobby C Smith Jr Energy FacilityEffingham5973,193,378
Wansley Unit 9Heard5942,201,110
Sewell Creek EnergyPolk570415,682
Chattahoochee Energy FacilityHeard5403,696,404

Source: EIA Forms EIA-860 and EIA-923, 2025.