Petroleum power plant, Louisiana
Brame Energy Center, Louisiana
Brame Energy Center is a 1,707 MW power plant, 704 MW of it petroleum, in Rapides Parish, Louisiana, operated by Cleco Power LLC, and it generated 2,760,317 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.7% of the generation reported in Louisiana, and its capacity factor sits at the 87th percentile of U.S. petroleum plants. By 2025 generation it ranks 417th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Brame Energy Center plant run compared with other petroleum plants?
The Brame Energy Center plant's petroleum units had a capacity factor of 8% in 2025 on 634 MW of net summer capacity, the 87th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. That equals about 29 days at full output out of 365.
0%Shaded: the middle half of petroleum plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Brame Energy Center | 8% |
| Petroleum plants, 75th percentile | 1% |
| Petroleum plants, median | 1% |
| Petroleum plants, 25th percentile | 0% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its petroleum generators only. Values above 105% are left out of the comparison.
Is the Brame Energy Center plant generating more or less than last year?
Generation at Brame Energy Center rose 6.8% from 2024 to 2025, from 2,585,504 MWh to 2,760,317 MWh. Through August 2026 it is running 54.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 2,585,504 |
| 2025 | 2,760,317 |
| 2026 through August | 2,696,885 |
| 2025, same months | 1,746,352 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 419,767 |
| July 2026 | 464,345 |
| June 2026 | 434,263 |
| May 2026 | 294,572 |
| April 2026 | 187,500 |
| March 2026 | 361,986 |
| February 2026 | 256,986 |
| January 2026 | 277,466 |
| December 2025 | 260,162 |
| November 2025 | 199,717 |
| October 2025 | 253,087 |
| September 2025 | 300,999 |
| August 2025 | 303,832 |
| July 2025 | 283,181 |
| June 2025 | 240,406 |
| April 2025 | 260,735 |
| March 2025 | 130,439 |
| February 2025 | 210,875 |
| January 2025 | 316,884 |
| December 2024 | 79,577 |
| November 2024 | 253,598 |
| October 2024 | 147,269 |
| September 2024 | 261,560 |
| August 2024 | 282,226 |
| July 2024 | 320,150 |
| June 2024 | 247,445 |
| May 2024 | 106,211 |
| April 2024 | 190,810 |
| March 2024 | 256,429 |
| February 2024 | 209,460 |
| January 2024 | 230,769 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Brame Energy Center plant, and when do they retire?
3 operable generators total 1,707 MW, with an average age of 33 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 1 | 446 | 26% | none reported |
| 1980s | 1 | 558 | 33% | none reported |
| 2010s | 1 | 704 | 41% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Steam Turbine | 446 | 1975 | n/a |
| 2 | Operating | Conventional Steam Coal | 558 | 1982 | n/a |
| 3 | Operating | Petroleum Coke | 704 | 2010 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Brame Energy Center plant?
3 owners report shares in Brame Energy Center; Lafayette Utilities System holds the largest named share, 16.3% or about 279 MW. Cleco Power LLC operates the plant. The listed shares add up to 32.7% of capacity; generators without joint owners are not on this list.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Lafayette Utilities System | 16.3% | 279 | 451,036 |
| Cleco Power LLC | 9.8% | 167 | 270,511 |
| Louisiana Energy & Power Authority | 6.5% | 112 | 180,525 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
What does Cleco Power LLC charge homes?
Cleco Power LLC, the operator of Brame Energy Center, had an average residential price of 14.26¢ per kWh and an average bill of $178 a month in 2025, 14% above the Louisiana average of 12.52¢.
| Measure | Price | Monthly bill | Against Louisiana |
|---|---|---|---|
| Cleco Power LLC | 14.26¢ | $178 | 14% higher |
| Louisiana average | 12.52¢ | $153 | |
| U.S. average | 17.23¢ | $151 | 38% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the Brame Energy Center plant use?
Brame Energy Center has capacity on 3 fuels: 41% petroleum, 33% coal and 26% natural gas. In 2025, petroleum made 16% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Petroleum | 704 | 41.2% | 438,049 |
| Coal | 558 | 32.7% | 1,467,622 |
| Natural gas | 446 | 26.1% | 854,646 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Brame Energy Center plant?
Brame Energy Center is in Lena, Rapides Parish, Louisiana, at 31.3950° N, 92.7167° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.