Solar power plant, Virginia
Briel Solar Farm, Virginia
Briel Solar Farm is a 20 MW solar power plant in Henrico County, Virginia, operated by Briel Solar Farm, LLC, and it generated 36,229 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 30th percentile of U.S. solar plants. By 2025 generation it ranks 4,497th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Briel Solar Farm plant run compared with other solar plants?
The Briel Solar Farm plant had a capacity factor of 21% in 2025 on 20 MW of net summer capacity, the 30th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 75 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Briel Solar Farm | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Briel Solar Farm plant generating more or less than last year?
Generation at Briel Solar Farm fell 6.6% from 2024 to 2025, from 38,773 MWh to 36,229 MWh.
| Period | MWh |
|---|---|
| 2024 | 38,773 |
| 2025 | 36,229 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,469 |
| November 2025 | 2,174 |
| October 2025 | 2,853 |
| September 2025 | 2,787 |
| August 2025 | 3,411 |
| July 2025 | 3,378 |
| June 2025 | 4,018 |
| May 2025 | 3,878 |
| April 2025 | 4,128 |
| March 2025 | 3,817 |
| February 2025 | 2,296 |
| January 2025 | 2,020 |
| December 2024 | 1,803 |
| November 2024 | 2,099 |
| October 2024 | 3,650 |
| September 2024 | 2,762 |
| August 2024 | 4,330 |
| July 2024 | 4,311 |
| June 2024 | 5,106 |
| May 2024 | 3,932 |
| April 2024 | 3,557 |
| March 2024 | 2,750 |
| February 2024 | 2,776 |
| January 2024 | 1,697 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Briel Solar Farm plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BMS | Operating | Solar Photovoltaic | 20 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Briel Solar Farm plant?
EIA lists no joint owners for Briel Solar Farm. Briel Solar Farm, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Briel Solar Farm plant?
Briel Solar Farm is in Standston, Henrico County, Virginia, at 37.5236° N, 77.2636° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Briel Solar Farm's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Montross Solar | Westmoreland | 20 | 37,413 |
| Grassfield Solar | Chesapeake City | 20 | 41,387 |
| Energix Leatherwood, LLC | Henry | 20 | 42,294 |
| Briel Solar Farm | Henrico | 20 | 36,229 |
| Pleasant Hill Solar | Suffolk City | 20 | 42,045 |
| Watlington Solar | Halifax | 20 | 43,556 |
| Caden Energix Wytheville LLC | Wythe | 20 | 37,912 |
Source: EIA Forms EIA-860 and EIA-923, 2025.