Skip to main content
RateWatt

Biomass power plant, New Hampshire

Burgess BioPower biomass power plant, New Hampshire

Burgess BioPower is a 75 MW biomass power plant in Coos County, New Hampshire, operated by Berlin Station, LLC, and it generated 390,190 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.0% of the generation reported in New Hampshire, and its capacity factor sits at the 76th percentile of U.S. biomass plants. By 2025 generation it ranks 1,618th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

75 MWNameplate capacity
66%Capacity factor, 2025, 76th percentile, on 67.5 MW net summer
2.0%Of NH generation, 2025
12 yearsAverage generator age, by MW

How hard does the Burgess BioPower plant run compared with other biomass plants?

The Burgess BioPower plant had a capacity factor of 66% in 2025 on 67.5 MW of net summer capacity, the 76th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 241 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Burgess BioPower66%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Burgess BioPower plant generating more or less than last year?

Generation at Burgess BioPower rose 11.9% from 2024 to 2025, from 348,592 MWh to 390,190 MWh.

Net generation by period
PeriodMWh
2024348,592
2025390,190
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202548,397
November 202533,505
October 202510,887
September 202512,638
August 202541,259
July 202543,918
June 202536,931
May 202535,573
April 20257,846
March 202535,365
February 202540,983
January 202542,888
December 202440,586
November 202434,573
October 20245,057
September 202423,213
August 202440,923
July 202441,067
June 202440,865
May 202420,414
April 2024504
March 202434,234
February 202431,095
January 202436,061

Source: EIA Form EIA-923, through August 2026.

How much of New Hampshire's electricity comes from the Burgess BioPower plant?

Burgess BioPower made 2.0% of the 19,112,246 MWh reported by New Hampshire plants in 2025, from 1.6% of the state's 4,582 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 9th largest of 61 plants in New Hampshire, the 3,097th largest of 14,327 in the U.S. and the 40th largest of 585 biomass plants. By 2025 generation it is the 4th largest of 57 generating plants in the state.

Burgess BioPower within New Hampshire, 2025
MeasureThis plantNew HampshireShare
Capacity (MW)754,5821.6%
Generation (MWh)390,19019,112,2462.0%
Biomass capacity (MW)7521135.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Burgess BioPower plant, and when do they retire?

1 operable generator totals 75 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ST01OperatingWood/Wood Waste Biomass752013n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Burgess BioPower plant?

EIA lists no joint owners for Burgess BioPower. Berlin Station, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Burgess BioPower plant?

Burgess BioPower is in Berlin, Coos County, New Hampshire, at 44.4719° N, 71.1753° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.