Biomass power plant, Michigan
Cadillac Renewable Energy biomass power plant, Michigan
Cadillac Renewable Energy is a 44 MW biomass power plant in Wexford County, Michigan, operated by Cadillac Renewable Energy LLC, and it generated 169,454 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Michigan, and its capacity factor sits at the 56th percentile of U.S. biomass plants. By 2025 generation it ranks 2,723rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cadillac Renewable Energy plant run compared with other biomass plants?
The Cadillac Renewable Energy plant had a capacity factor of 51% in 2025 on 38 MW of net summer capacity, the 56th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 186 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cadillac Renewable Energy | 51% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Cadillac Renewable Energy plant generating more or less than last year?
Generation at Cadillac Renewable Energy rose 24.9% from 2024 to 2025, from 135,689 MWh to 169,454 MWh.
| Period | MWh |
|---|---|
| 2024 | 135,689 |
| 2025 | 169,454 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 17,908 |
| November 2025 | 15,300 |
| October 2025 | 15,439 |
| September 2025 | 7,965 |
| August 2025 | 14,750 |
| July 2025 | 16,790 |
| June 2025 | 14,374 |
| May 2025 | 12,939 |
| April 2025 | 9,926 |
| March 2025 | 13,153 |
| February 2025 | 14,373 |
| January 2025 | 16,537 |
| December 2024 | 12,791 |
| November 2024 | 11,257 |
| October 2024 | 11,506 |
| September 2024 | 6,487 |
| August 2024 | 12,785 |
| July 2024 | 12,285 |
| June 2024 | 11,301 |
| May 2024 | 10,301 |
| April 2024 | 11,412 |
| March 2024 | 10,932 |
| February 2024 | 10,275 |
| January 2024 | 14,357 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cadillac Renewable Energy plant, and when do they retire?
1 operable generator totals 44 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 44 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 44 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN2 | Operating | Wood/Wood Waste Biomass | 44 | 2020 | n/a |
| GEN1 | Retired | Wood/Wood Waste Biomass | 44 | 1993 | 2020 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cadillac Renewable Energy plant?
EIA lists no joint owners for Cadillac Renewable Energy. Cadillac Renewable Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Cadillac Renewable Energy plant?
Cadillac Renewable Energy is in Cadillac, Wexford County, Michigan, at 44.2617° N, 85.4352° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in Michigan are similar in size?
Michigan has 33 operable biomass plants with 531 MW of capacity, and Cadillac Renewable Energy's 44 MW is 8% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Billerud Quinnesec Mill | Dickinson | 56 | 308,315 |
| Cadillac Renewable Energy | Wexford | 44 | 169,449 |
| Genesee Power Station LP | Genesee | 40 | 116,384 |
| Grayling Generating Station | Crawford | 39 | 181,919 |
| GRS Arbor Hills | Washtenaw | 30 | 1,138 |
Source: EIA Forms EIA-860 and EIA-923, 2025.