Skip to main content
RateWatt

Natural gas power plant, Kentucky

Calvert City natural gas power plant, Kentucky

Calvert City is a 26.7 MW natural gas power plant in Marshall County, Kentucky, operated by DTE Calvert City LLC, and it generated 215,821 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Kentucky. By 2025 generation it ranks 2,384th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

26.7 MWNameplate capacity
n/aCapacity factor, 2025
0.3%Of KY generation, 2025
25 yearsAverage generator age, by MW

Is the Calvert City plant generating more or less than last year?

Generation at Calvert City rose 0.8% from 2024 to 2025, from 214,208 MWh to 215,821 MWh. Through August 2026 it is running 0.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024214,208
2025215,821
2026 through August147,173
2025, same months147,795
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,284
July 202617,795
June 202617,719
May 202617,611
April 202615,279
March 202619,739
February 202619,146
January 202621,600
December 202521,457
November 202515,037
October 202513,336
September 202518,196
August 202518,538
July 202517,873
June 202518,122
May 202519,513
April 202515,720
March 202520,438
February 202517,656
January 202519,935
December 202419,941
November 202420,556
October 202413,766
September 202417,818
August 202417,385
July 20249,232
June 202416,446
May 202418,670
April 202419,011
March 202420,363
February 202419,449
January 202421,571

Source: EIA Form EIA-923, through August 2026.

How much of Kentucky's electricity comes from the Calvert City plant?

Calvert City made 0.3% of the 73,948,902 MWh reported by Kentucky plants in 2025, from 0.1% of the state's 22,180 MW of capacity. Its share of output is 2.4 times its share of capacity. By capacity it is the 40th largest of 62 plants in Kentucky, the 4,503rd largest of 14,327 in the U.S. and the 1,232nd largest of 1,962 natural gas plants. By 2025 generation it is the 27th largest of 59 generating plants in the state.

Calvert City within Kentucky, 2025
MeasureThis plantKentuckyShare
Capacity (MW)2722,1800.1%
Generation (MWh)215,82173,948,9020.3%
Natural gas capacity (MW)278,3630.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Calvert City plant, and when do they retire?

1 operable generator totals 26.7 MW, with an average age of 25 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s127100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingNatural Gas Fired Combustion Turbine272000n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Calvert City plant?

EIA lists no joint owners for Calvert City. DTE Calvert City LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Calvert City plant?

Calvert City is in Calvert City, Marshall County, Kentucky, at 37.0483° N, 88.3539° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Kentucky are similar in size?

Kentucky has 14 operable natural gas plants with 8,363 MW of capacity, and Calvert City's 26.7 MW is 0% of that.

Natural gas plants in Kentucky around this size
PlantCountyMW2025 MWh
HaeflingFayette4176
Calvert CityMarshall27215,821

Source: EIA Forms EIA-860 and EIA-923, 2025.