Wind power plant, California
Cameron Ridge LLC wind power plant, California
Cameron Ridge LLC is a 59.6 MW wind power plant in Kern County, California, operated by Terra-Gen Operating Co-Wind, and it generated 148,031 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 33rd percentile of U.S. wind plants. By 2025 generation it ranks 2,919th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cameron Ridge LLC plant run compared with other wind plants?
The Cameron Ridge LLC plant had a capacity factor of 28% in 2025 on 59.6 MW of net summer capacity, the 33rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 103 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cameron Ridge LLC | 28% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Cameron Ridge LLC plant generating more or less than last year?
Generation at Cameron Ridge LLC rose 2.8% from 2024 to 2025, from 143,994 MWh to 148,031 MWh.
| Period | MWh |
|---|---|
| 2024 | 143,994 |
| 2025 | 148,031 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 8,414 |
| November 2025 | 5,886 |
| October 2025 | 9,119 |
| September 2025 | 9,204 |
| August 2025 | 14,302 |
| July 2025 | 15,926 |
| June 2025 | 15,966 |
| May 2025 | 18,394 |
| April 2025 | 16,979 |
| March 2025 | 14,524 |
| February 2025 | 11,671 |
| January 2025 | 7,646 |
| December 2024 | 10,064 |
| November 2024 | 7,909 |
| October 2024 | 9,399 |
| September 2024 | 9,590 |
| August 2024 | 14,133 |
| July 2024 | 10,976 |
| June 2024 | 14,902 |
| May 2024 | 17,716 |
| April 2024 | 13,653 |
| March 2024 | 14,670 |
| February 2024 | 8,402 |
| January 2024 | 12,580 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cameron Ridge LLC plant, and when do they retire?
1 operable generator totals 59.6 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 60 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| EXIS | Operating | Onshore Wind Turbine | 60 | 1984 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cameron Ridge LLC plant?
Cameron Ridge LLC is the only joint owner reported for Cameron Ridge LLC, with 100.0%. Terra-Gen Operating Co-Wind operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Cameron Ridge LLC plant?
Cameron Ridge LLC is in Mojave, Kern County, California, at 35.0750° N, 118.3158° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in California are similar in size?
California has 111 operable wind plants with 6,479 MW of capacity, and Cameron Ridge LLC's 59.6 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Coachella Hills Wind | Riverside | 61 | 219,258 |
| Oasis Wind | Kern | 60 | 221,077 |
| Sky River Wind Energy Center | Kern | 60 | 211,467 |
| Cameron Ridge LLC | Kern | 60 | 148,031 |
| Summit Winds | Alameda | 58 | 191,268 |
| Kumeyaay Wind | San Diego | 50 | 130,519 |
| San Gorgonio Windplant WPP1993 | Riverside | 50 | 191,920 |
Source: EIA Forms EIA-860 and EIA-923, 2025.