Skip to main content
RateWatt

Petroleum power plant, Hawaii

Campbell Industrial Park petroleum power plant, Hawaii

Campbell Industrial Park is a 113 MW petroleum power plant in Honolulu County, Hawaii, operated by Hawaiian Electric Co Inc, and it generated 93,553 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Hawaii, and its capacity factor sits at the 87th percentile of U.S. petroleum plants. By 2025 generation it ranks 3,467th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

113 MWNameplate capacity
9%Capacity factor, 2025, 87th percentile, on 113 MW net summer
1.0%Of HI generation, 2025
16 yearsAverage generator age, by MW

How hard does the Campbell Industrial Park plant run compared with other petroleum plants?

The Campbell Industrial Park plant had a capacity factor of 9% in 2025 on 113 MW of net summer capacity, the 87th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. That equals about 34 days at full output out of 365.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Campbell Industrial Park9%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Campbell Industrial Park plant generating more or less than last year?

Generation at Campbell Industrial Park fell 1.5% from 2024 to 2025, from 95,005 MWh to 93,553 MWh. Through August 2026 it is running 170.8% ahead of the same months of 2025.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202495,005
202593,553
2026 through August95,520
2025, same months35,277
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202621,842
July 20265,217
June 20266,936
May 20268,349
April 202611,615
March 202620,755
February 20264,836
January 202615,970
December 202522,815
November 202520,853
October 20258,695
September 20255,913
August 202520,294
July 20258,095
June 2025836
May 2025-1,202
April 20256,351
March 2025126
February 2025-434
January 20251,211
December 202410,093
November 2024445
October 20246,077
September 20249,498
August 202415,555
July 20247,695
June 20249,874
May 20245,171
April 20246,563
March 20242,237
February 20246,063
January 202415,734

Source: EIA Form EIA-923, through August 2026.

How much of Hawaii's electricity comes from the Campbell Industrial Park plant?

Campbell Industrial Park made 1.0% of the 9,269,869 MWh reported by Hawaii plants in 2025, from 3.1% of the state's 3,691 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 8th largest of 76 plants in Hawaii, the 2,407th largest of 14,327 in the U.S. and the 49th largest of 861 petroleum plants. By 2025 generation it is the 16th largest of 65 generating plants in the state.

Campbell Industrial Park within Hawaii, 2025
MeasureThis plantHawaiiShare
Capacity (MW)1133,6913.1%
Generation (MWh)93,5539,269,8691.0%
Petroleum capacity (MW)1132,0705.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Campbell Industrial Park plant, and when do they retire?

1 operable generator totals 113 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1113100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CIP1OperatingPetroleum Liquids1132009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Campbell Industrial Park plant?

EIA lists no joint owners for Campbell Industrial Park. Hawaiian Electric Co Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Hawaiian Electric Co Inc charge homes?

Hawaiian Electric Co Inc, the operator of Campbell Industrial Park, had an average residential price of 40.54¢ per kWh and an average bill of $190 a month in 2025, about the same as the Hawaii average of 40.40¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Hawaii
Hawaiian Electric Co Inc40.54¢$190about the same
Hawaii average40.40¢$208
U.S. average17.23¢$15157% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Campbell Industrial Park plant?

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in Hawaii are similar in size?

Hawaii has 19 operable petroleum plants with 2,070 MW of capacity, and Campbell Industrial Park's 113 MW is 5% of that.

Petroleum plants in Hawaii around this size
PlantCountyMW2025 MWh
Campbell Industrial ParkHonolulu11393,553
Port Allen (HI)Kauai9078,803
KeaholeHawaii89319,515
Hamakua Energy PlantHawaii6654,987

Source: EIA Forms EIA-860 and EIA-923, 2025.