Skip to main content
RateWatt

Natural gas power plant, California

Campbell Power Plant, California

Campbell Power Plant is a 174 MW natural gas power plant in Sacramento County, California, operated by Sacramento Municipal Util Dist, and it generated 576,034 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 63rd percentile of U.S. natural gas plants. By 2025 generation it ranks 1,174th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

174 MWNameplate capacity
37%Capacity factor, 2025, 63rd percentile, on 178 MW net summer
0.3%Of CA generation, 2025
28 yearsAverage generator age, by MW

How hard does Campbell Power Plant run compared with other natural gas plants?

Campbell Power Plant had a capacity factor of 37% in 2025 on 178 MW of net summer capacity, the 63rd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 135 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Campbell Power Plant37%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Campbell Power Plant generating more or less than last year?

Generation at Campbell Power Plant fell 14.3% from 2024 to 2025, from 672,147 MWh to 576,034 MWh. Through August 2026 it is running 12.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024672,147
2025576,034
2026 through August249,637
2025, same months284,554
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202670,539
July 202667,906
June 202620,039
May 202633,174
April 202625,055
March 202632,679
February 2026245
January 20260
December 202561,329
November 202560,376
October 202594,302
September 202575,473
August 202578,688
July 202543,618
June 20250
May 202520,417
April 202519,863
March 20250
February 202530,500
January 202591,468
December 202495,294
November 202453,878
October 202422,006
September 202433,358
August 202464,026
July 202473,360
June 202443,636
May 202436,057
April 202487,817
March 20241,316
February 202469,516
January 202491,883

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from Campbell Power Plant?

Campbell Power Plant made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 152nd largest of 1,877 plants in California, the 1,798th largest of 14,327 in the U.S. and the 749th largest of 1,962 natural gas plants. By 2025 generation it is the 70th largest of 1,608 generating plants in the state.

Campbell Power Plant within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)174107,4330.2%
Generation (MWh)576,034204,542,8980.3%
Natural gas capacity (MW)17440,2110.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Campbell Power Plant, and when do they retire?

2 operable generators total 174 MW, with an average age of 28 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s2174100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CCCTOperatingNatural Gas Fired Combined Cycle1191997n/a
CCSTOperatingNatural Gas Fired Combined Cycle551997n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Campbell Power Plant?

EIA lists no joint owners for Campbell Power Plant. Sacramento Municipal Util Dist operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Sacramento Municipal Util Dist charge homes?

Sacramento Municipal Util Dist, the operator of Campbell Power Plant, had an average residential price of 18.93¢ per kWh and an average bill of $125 a month in 2025, 40% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Sacramento Municipal Util Dist18.93¢$12540% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Campbell Power Plant?

Campbell Power Plant is in Sacramento, Sacramento County, California, at 38.5110° N, 121.4735° W. It sits in the Balancing Authority of Northern California balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Campbell Power Plant's 174 MW is 0% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Procter & Gamble Power PlantSacramento193553,438
Redding PowerShasta183189,278
El Segundo CogenLos Angeles1801,212,541
Campbell Power PlantSacramento174576,034
Humboldt BayHumboldt167358,040
Richmond CogenContra Costa156945,535
Donald Von Raesfeld Power PlantSanta Clara154771,253

Source: EIA Forms EIA-860 and EIA-923, 2025.