Natural gas power plant, California
Campbell Power Plant, California
Campbell Power Plant is a 174 MW natural gas power plant in Sacramento County, California, operated by Sacramento Municipal Util Dist, and it generated 576,034 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 63rd percentile of U.S. natural gas plants. By 2025 generation it ranks 1,174th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Campbell Power Plant run compared with other natural gas plants?
Campbell Power Plant had a capacity factor of 37% in 2025 on 178 MW of net summer capacity, the 63rd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 135 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Campbell Power Plant | 37% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Campbell Power Plant generating more or less than last year?
Generation at Campbell Power Plant fell 14.3% from 2024 to 2025, from 672,147 MWh to 576,034 MWh. Through August 2026 it is running 12.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 672,147 |
| 2025 | 576,034 |
| 2026 through August | 249,637 |
| 2025, same months | 284,554 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 70,539 |
| July 2026 | 67,906 |
| June 2026 | 20,039 |
| May 2026 | 33,174 |
| April 2026 | 25,055 |
| March 2026 | 32,679 |
| February 2026 | 245 |
| January 2026 | 0 |
| December 2025 | 61,329 |
| November 2025 | 60,376 |
| October 2025 | 94,302 |
| September 2025 | 75,473 |
| August 2025 | 78,688 |
| July 2025 | 43,618 |
| June 2025 | 0 |
| May 2025 | 20,417 |
| April 2025 | 19,863 |
| March 2025 | 0 |
| February 2025 | 30,500 |
| January 2025 | 91,468 |
| December 2024 | 95,294 |
| November 2024 | 53,878 |
| October 2024 | 22,006 |
| September 2024 | 33,358 |
| August 2024 | 64,026 |
| July 2024 | 73,360 |
| June 2024 | 43,636 |
| May 2024 | 36,057 |
| April 2024 | 87,817 |
| March 2024 | 1,316 |
| February 2024 | 69,516 |
| January 2024 | 91,883 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Campbell Power Plant, and when do they retire?
2 operable generators total 174 MW, with an average age of 28 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 2 | 174 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CCCT | Operating | Natural Gas Fired Combined Cycle | 119 | 1997 | n/a |
| CCST | Operating | Natural Gas Fired Combined Cycle | 55 | 1997 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Campbell Power Plant?
EIA lists no joint owners for Campbell Power Plant. Sacramento Municipal Util Dist operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Sacramento Municipal Util Dist charge homes?
Sacramento Municipal Util Dist, the operator of Campbell Power Plant, had an average residential price of 18.93¢ per kWh and an average bill of $125 a month in 2025, 40% below the California average of 31.35¢.
| Measure | Price | Monthly bill | Against California |
|---|---|---|---|
| Sacramento Municipal Util Dist | 18.93¢ | $125 | 40% lower |
| California average | 31.35¢ | $155 | |
| U.S. average | 17.23¢ | $151 | 45% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is Campbell Power Plant?
Campbell Power Plant is in Sacramento, Sacramento County, California, at 38.5110° N, 121.4735° W. It sits in the Balancing Authority of Northern California balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Campbell Power Plant's 174 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Procter & Gamble Power Plant | Sacramento | 193 | 553,438 |
| Redding Power | Shasta | 183 | 189,278 |
| El Segundo Cogen | Los Angeles | 180 | 1,212,541 |
| Campbell Power Plant | Sacramento | 174 | 576,034 |
| Humboldt Bay | Humboldt | 167 | 358,040 |
| Richmond Cogen | Contra Costa | 156 | 945,535 |
| Donald Von Raesfeld Power Plant | Santa Clara | 154 | 771,253 |
Source: EIA Forms EIA-860 and EIA-923, 2025.