Hydro power plant, Kentucky
Cannelton Hydroelectric Plant, Kentucky
Cannelton Hydroelectric Plant is a 87.9 MW hydro power plant in Hancock County, Kentucky, operated by American Mun Power-Ohio, Inc, and it generated 416,915 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Kentucky, and its capacity factor sits at the 92nd percentile of U.S. hydro plants. By 2025 generation it ranks 1,541st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Cannelton Hydroelectric Plant run compared with other hydro plants?
Cannelton Hydroelectric Plant had a capacity factor of 54% in 2025 on 87.9 MW of net summer capacity, the 92nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 198 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cannelton Hydroelectric Plant | 54% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Cannelton Hydroelectric Plant generating more or less than last year?
Generation at Cannelton Hydroelectric Plant rose 0.3% from 2024 to 2025, from 415,857 MWh to 416,915 MWh.
| Period | MWh |
|---|---|
| 2024 | 415,857 |
| 2025 | 416,915 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 50,070 |
| November 2025 | 48,255 |
| October 2025 | 30,311 |
| September 2025 | 20,401 |
| August 2025 | 29,287 |
| July 2025 | 56,507 |
| June 2025 | 37,874 |
| May 2025 | 30,956 |
| April 2025 | 21,654 |
| March 2025 | 35,873 |
| February 2025 | 3,779 |
| January 2025 | 51,948 |
| December 2024 | 47,729 |
| November 2024 | 44,110 |
| October 2024 | 32,865 |
| September 2024 | 20,410 |
| August 2024 | 28,714 |
| July 2024 | 30,370 |
| June 2024 | 39,506 |
| May 2024 | 52,970 |
| April 2024 | 16,579 |
| March 2024 | 31,438 |
| February 2024 | 35,118 |
| January 2024 | 36,048 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Cannelton Hydroelectric Plant, and when do they retire?
3 operable generators total 87.9 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 3 | 88 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CG1 | Operating | Conventional Hydroelectric | 29 | 2016 | n/a |
| CG2 | Operating | Conventional Hydroelectric | 29 | 2016 | n/a |
| CG3 | Operating | Conventional Hydroelectric | 29 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Cannelton Hydroelectric Plant?
EIA lists no joint owners for Cannelton Hydroelectric Plant. American Mun Power-Ohio, Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Cannelton Hydroelectric Plant?
Cannelton Hydroelectric Plant is in Hawesville, Hancock County, Kentucky, at 37.8997° N, 86.7058° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Kentucky are similar in size?
Kentucky has 11 operable hydro plants with 1,100 MW of capacity, and Cannelton Hydroelectric Plant's 87.9 MW is 8% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Barkley | Lyon | 130 | 624,854 |
| Ohio Falls | Jefferson | 110 | 219,537 |
| Meldahl Hydroelectric Project | Bracken | 105 | 470,504 |
| Cannelton Hydroelectric Plant | Hancock | 88 | 416,915 |
| Smithland Hydroelectric Plant | Livingston | 76 | 336,267 |
| Laurel Dam | Laurel | 70 | 88,759 |
Source: EIA Forms EIA-860 and EIA-923, 2025.