Battery and pumped storage power plant, California
Castaic storage power plant, California
Castaic is a 1,682 MW power plant, 1,626 MW of it battery and pumped storage, in Los Angeles County, California, operated by Los Angeles Department of Water & Power, and it generated 158,926 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California. By 2025 generation it ranks 2,815th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Castaic plant run compared with other battery and pumped storage plants?
The Castaic plant's battery and pumped storage units had a capacity factor of 1% in 2025 on 1,623 MW of net summer capacity, below nearly all of the 9 U.S. battery and pumped storage plants with at least 20 MW. The typical battery and pumped storage plant reached 6%. That equals about 4 days at full output out of 365.
0%Shaded: the middle half of battery and pumped storage plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Castaic | 1% |
| Battery and pumped storage plants, 75th percentile | 14% |
| Battery and pumped storage plants, median | 6% |
| Battery and pumped storage plants, 25th percentile | 5% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its battery and pumped storage generators only. Values above 105% are left out of the comparison.
Is the Castaic plant generating more or less than last year?
Castaic generated 158,926 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.1% ahead of the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.
8 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 93,298 |
| 2025 | 158,926 |
| 2026 through August | 129,141 |
| 2025, same months | 122,861 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 3,909 |
| July 2026 | 8,551 |
| June 2026 | 21,256 |
| May 2026 | 27,259 |
| April 2026 | 41,745 |
| March 2026 | 17,636 |
| February 2026 | 8,743 |
| January 2026 | 42 |
| December 2025 | 8,207 |
| November 2025 | -5,888 |
| October 2025 | 37,958 |
| September 2025 | -4,212 |
| August 2025 | -13,302 |
| July 2025 | 13,074 |
| June 2025 | -2,185 |
| May 2025 | 54,052 |
| April 2025 | 46,803 |
| March 2025 | 10,546 |
| February 2025 | 5,627 |
| January 2025 | 8,246 |
| December 2024 | 37,344 |
| November 2024 | 23,218 |
| October 2024 | 5,002 |
| September 2024 | 4,010 |
| August 2024 | -10,252 |
| July 2024 | 9,533 |
| June 2024 | 1,102 |
| May 2024 | 35,846 |
| April 2024 | -7,079 |
| March 2024 | -434 |
| February 2024 | 1,077 |
| January 2024 | -6,069 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Castaic plant, and when do they retire?
7 operable generators total 1,682 MW, with an average age of 49 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 7 | 1,682 | 100% | none reported |
Every generator, 7 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 7 | Operating | Conventional Hydroelectric | 56 | 1972 | n/a |
| 1 | Operating | Hydroelectric Pumped Storage | 271 | 1973 | n/a |
| 2 | Operating | Hydroelectric Pumped Storage | 271 | 1974 | n/a |
| 3 | Operating | Hydroelectric Pumped Storage | 271 | 1976 | n/a |
| 4 | Operating | Hydroelectric Pumped Storage | 271 | 1977 | n/a |
| 5 | Operating | Hydroelectric Pumped Storage | 271 | 1977 | n/a |
| 6 | Operating | Hydroelectric Pumped Storage | 271 | 1978 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Castaic plant?
EIA lists no joint owners for Castaic. Los Angeles Department of Water & Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Los Angeles Department of Water & Power charge homes?
Los Angeles Department of Water & Power, the operator of Castaic, had an average residential price of 26.48¢ per kWh and an average bill of $124 a month in 2025, 16% below the California average of 31.35¢.
| Measure | Price | Monthly bill | Against California |
|---|---|---|---|
| Los Angeles Department of Water & Power | 26.48¢ | $124 | 16% lower |
| California average | 31.35¢ | $155 | |
| U.S. average | 17.23¢ | $151 | 45% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the Castaic plant use?
Castaic has capacity on 2 fuels: 97% battery and pumped storage and 3% hydro. In 2025, battery and pumped storage made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Battery and pumped storage | 1,626 | 96.7% | 158,926 |
| Hydro | 56 | 3.3% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Castaic plant?
Castaic is in Castaic, Los Angeles County, California, at 34.5872° N, 118.6566° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which battery and pumped storage plants in California are similar in size?
California has 132 operable battery and pumped storage plants with 11,629 MW of capacity, and Castaic's 1,626 MW is 14% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Castaic | Los Angeles | 1,626 | 158,926 |
| Helms Pumped Storage | Fresno | 1,053 | -467,243 |
Source: EIA Forms EIA-860 and EIA-923, 2025.