Skip to main content
RateWatt

Battery and pumped storage power plant, California

Castaic storage power plant, California

Castaic is a 1,682 MW power plant, 1,626 MW of it battery and pumped storage, in Los Angeles County, California, operated by Los Angeles Department of Water & Power, and it generated 158,926 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California. By 2025 generation it ranks 2,815th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,682 MWNameplate capacity
1%Capacity factor, 2025, battery and pumped storage units, on 1,623 MW net summer
0.1%Of CA generation, 2025
49 yearsAverage generator age, by MW

How hard does the Castaic plant run compared with other battery and pumped storage plants?

The Castaic plant's battery and pumped storage units had a capacity factor of 1% in 2025 on 1,623 MW of net summer capacity, below nearly all of the 9 U.S. battery and pumped storage plants with at least 20 MW. The typical battery and pumped storage plant reached 6%. That equals about 4 days at full output out of 365.

0%Shaded: the middle half of battery and pumped storage plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Castaic1%
Battery and pumped storage plants, 75th percentile14%
Battery and pumped storage plants, median6%
Battery and pumped storage plants, 25th percentile5%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its battery and pumped storage generators only. Values above 105% are left out of the comparison.

Is the Castaic plant generating more or less than last year?

Castaic generated 158,926 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.1% ahead of the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.

8 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202493,298
2025158,926
2026 through August129,141
2025, same months122,861
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20263,909
July 20268,551
June 202621,256
May 202627,259
April 202641,745
March 202617,636
February 20268,743
January 202642
December 20258,207
November 2025-5,888
October 202537,958
September 2025-4,212
August 2025-13,302
July 202513,074
June 2025-2,185
May 202554,052
April 202546,803
March 202510,546
February 20255,627
January 20258,246
December 202437,344
November 202423,218
October 20245,002
September 20244,010
August 2024-10,252
July 20249,533
June 20241,102
May 202435,846
April 2024-7,079
March 2024-434
February 20241,077
January 2024-6,069

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Castaic plant?

Castaic made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 1.6% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 4th largest of 1,877 plants in California, the 119th largest of 14,327 in the U.S. and the 5th largest of 557 battery and pumped storage plants on its battery and pumped storage units alone. By 2025 generation it is the 284th largest of 1,608 generating plants in the state.

Castaic within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)1,682107,4331.6%
Generation (MWh)158,926204,542,8980.1%
Battery and pumped storage capacity (MW)1,62611,62914.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Castaic plant, and when do they retire?

7 operable generators total 1,682 MW, with an average age of 49 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s71,682100%none reported
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
7OperatingConventional Hydroelectric561972n/a
1OperatingHydroelectric Pumped Storage2711973n/a
2OperatingHydroelectric Pumped Storage2711974n/a
3OperatingHydroelectric Pumped Storage2711976n/a
4OperatingHydroelectric Pumped Storage2711977n/a
5OperatingHydroelectric Pumped Storage2711977n/a
6OperatingHydroelectric Pumped Storage2711978n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Castaic plant?

EIA lists no joint owners for Castaic. Los Angeles Department of Water & Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Los Angeles Department of Water & Power charge homes?

Los Angeles Department of Water & Power, the operator of Castaic, had an average residential price of 26.48¢ per kWh and an average bill of $124 a month in 2025, 16% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Los Angeles Department of Water & Power26.48¢$12416% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Castaic plant use?

Castaic has capacity on 2 fuels: 97% battery and pumped storage and 3% hydro. In 2025, battery and pumped storage made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Battery and pumped storage1,62696.7%158,926
Hydro563.3%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Castaic plant?

Castaic is in Castaic, Los Angeles County, California, at 34.5872° N, 118.6566° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which battery and pumped storage plants in California are similar in size?

California has 132 operable battery and pumped storage plants with 11,629 MW of capacity, and Castaic's 1,626 MW is 14% of that.

Battery and pumped storage plants in California around this size
PlantCountyMW2025 MWh
CastaicLos Angeles1,626158,926
Helms Pumped StorageFresno1,053-467,243

Source: EIA Forms EIA-860 and EIA-923, 2025.