Solar power plant, South Carolina
Catalina Solar power plant, South Carolina
Catalina Solar (SC) is a 75 MW solar power plant in Saluda County, South Carolina, operated by Catalina Solar, LLC, and it generated 26,064 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 5th percentile of U.S. solar plants. By 2025 generation it ranks 4,916th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Catalina Solar (SC) plant run compared with other solar plants?
The Catalina Solar (SC) plant had a capacity factor of 4% in 2025 on 75 MW of net summer capacity, the 5th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 14 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Catalina Solar (SC) | 4% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Catalina Solar (SC) plant generating more or less than last year?
Catalina Solar (SC) generated 26,064 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 26,064 |
| 2026 through August | 105,368 |
Monthly generation, Oct 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,679 |
| July 2026 | 18,127 |
| June 2026 | 16,674 |
| May 2026 | 12,035 |
| April 2026 | 17,084 |
| March 2026 | 10,439 |
| February 2026 | 6,986 |
| January 2026 | 7,344 |
| December 2025 | 5,590 |
| November 2025 | 9,459 |
| October 2025 | 11,015 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Catalina Solar (SC) plant, and when do they retire?
1 operable generator totals 75 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 75 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CAT01 | Operating | Solar Photovoltaic | 75 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Catalina Solar (SC) plant?
EIA lists no joint owners for Catalina Solar (SC). Catalina Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Catalina Solar (SC) plant?
Catalina Solar (SC) is in Batesburg, Saluda County, South Carolina, at 33.9029° N, 81.6015° W. It sits in the Duke Energy Carolinas balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in South Carolina are similar in size?
South Carolina has 126 operable solar plants with 1,956 MW of capacity, and Catalina Solar (SC)'s 75 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Allora Solar, LLC | Lexington | 75 | 154,008 |
| Centerfield Cooper Solar, LLC | Chesterfield | 75 | 139,570 |
| Gunsight Solar, LLC | Lexington | 75 | 173,457 |
| Catalina Solar (SC) | Saluda | 75 | 26,064 |
| Shaw Creek Solar, LLC | Aiken | 75 | 166,309 |
| Beulah Solar | Saluda | 75 | 151,861 |
| Eastover Solar | Richland | 74 | 144,310 |
Source: EIA Forms EIA-860 and EIA-923, 2025.