Natural gas power plant, Maryland
Central Utility Plant at White Oak natural gas power plant, Maryland
Central Utility Plant at White Oak is a 54.3 MW power plant, 47.4 MW of it natural gas, in Montgomery County, Maryland, operated by GSA Metropolitan Service Center, and it generated 93,668 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Maryland, and its capacity factor sits at the 51st percentile of U.S. natural gas plants. By 2025 generation it ranks 3,465th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Central Utility Plant at White Oak plant run compared with other natural gas plants?
The Central Utility Plant at White Oak plant's natural gas units had a capacity factor of 22% in 2025 on 47.3 MW of net summer capacity, the 51st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 82 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Central Utility Plant at White Oak | 22% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is the Central Utility Plant at White Oak plant generating more or less than last year?
Central Utility Plant at White Oak generated 93,668 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.0% ahead of the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 74,045 |
| 2025 | 93,668 |
| 2026 through August | 63,919 |
| 2025, same months | 62,644 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 8,771 |
| July 2026 | 9,279 |
| June 2026 | 8,223 |
| May 2026 | 7,671 |
| April 2026 | 7,520 |
| March 2026 | 7,672 |
| February 2026 | 6,928 |
| January 2026 | 7,854 |
| December 2025 | 7,653 |
| November 2025 | 7,345 |
| October 2025 | 7,759 |
| September 2025 | 8,266 |
| August 2025 | 8,464 |
| July 2025 | 10,137 |
| June 2025 | 8,756 |
| May 2025 | 7,982 |
| April 2025 | 7,773 |
| March 2025 | 7,933 |
| February 2025 | 3,822 |
| January 2025 | 7,778 |
| December 2024 | 7,769 |
| November 2024 | 7,516 |
| October 2024 | 7,899 |
| August 2024 | 9,227 |
| July 2024 | 9,653 |
| May 2024 | 8,604 |
| April 2024 | 7,919 |
| February 2024 | 7,429 |
| January 2024 | 8,029 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Central Utility Plant at White Oak plant, and when do they retire?
12 operable generators total 54.3 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 5 | 21 | 38% | none reported |
| 2010s | 7 | 33 | 62% | none reported |
Every generator, 12 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| G1 | Operating | Natural Gas Internal Combustion Engine | 6 | 2003 | n/a |
| G2 | On standby | Petroleum Liquids | 2 | 2003 | n/a |
| G3 | Operating | Natural Gas Fired Combustion Turbine | 4 | 2003 | n/a |
| G4 | Operating | Natural Gas Fired Combustion Turbine | 4 | 2008 | n/a |
| G5 | Operating | Natural Gas Fired Combustion Turbine | 4 | 2009 | n/a |
| G6 | Operating | Natural Gas Fired Combustion Turbine | 4 | 2010 | n/a |
| G7 | Operating | Natural Gas Fired Combined Cycle | 8 | 2014 | n/a |
| G8 | Operating | Natural Gas Fired Combined Cycle | 8 | 2014 | n/a |
| G9 | Operating | Natural Gas Fired Combined Cycle | 5 | 2014 | n/a |
| G10 | Operating | Petroleum Liquids | 2 | 2014 | n/a |
| G11 | Operating | Petroleum Liquids | 2 | 2014 | n/a |
| G12 | Operating | Natural Gas Fired Combined Cycle | 5 | 2014 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Central Utility Plant at White Oak plant?
EIA lists no joint owners for Central Utility Plant at White Oak. GSA Metropolitan Service Center operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Central Utility Plant at White Oak plant use?
Central Utility Plant at White Oak has capacity on 2 fuels: 87% natural gas and 13% petroleum. In 2025, natural gas made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 47 | 87.3% | 93,205 |
| Petroleum | 7 | 12.7% | 463 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Central Utility Plant at White Oak plant?
Central Utility Plant at White Oak is in Silver Spring, Montgomery County, Maryland, at 39.0394° N, 76.9825° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Maryland are similar in size?
Maryland has 16 operable natural gas plants with 6,347 MW of capacity, and Central Utility Plant at White Oak's 47.4 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Central Utility Plant at White Oak | Montgomery | 47 | 93,205 |
| NIH Cogeneration Facility | Montgomery | 28 | 152,409 |
Source: EIA Forms EIA-860 and EIA-923, 2025.