Skip to main content
RateWatt

Natural gas power plant, Maryland

Central Utility Plant at White Oak natural gas power plant, Maryland

Central Utility Plant at White Oak is a 54.3 MW power plant, 47.4 MW of it natural gas, in Montgomery County, Maryland, operated by GSA Metropolitan Service Center, and it generated 93,668 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Maryland, and its capacity factor sits at the 51st percentile of U.S. natural gas plants. By 2025 generation it ranks 3,465th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

54.3 MWNameplate capacity
22%Capacity factor, 2025, natural gas units, 51st percentile, on 47.3 MW net summer
0.2%Of MD generation, 2025
15 yearsAverage generator age, by MW

How hard does the Central Utility Plant at White Oak plant run compared with other natural gas plants?

The Central Utility Plant at White Oak plant's natural gas units had a capacity factor of 22% in 2025 on 47.3 MW of net summer capacity, the 51st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Central Utility Plant at White Oak22%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Central Utility Plant at White Oak plant generating more or less than last year?

Central Utility Plant at White Oak generated 93,668 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.0% ahead of the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
202474,045
202593,668
2026 through August63,919
2025, same months62,644
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,771
July 20269,279
June 20268,223
May 20267,671
April 20267,520
March 20267,672
February 20266,928
January 20267,854
December 20257,653
November 20257,345
October 20257,759
September 20258,266
August 20258,464
July 202510,137
June 20258,756
May 20257,982
April 20257,773
March 20257,933
February 20253,822
January 20257,778
December 20247,769
November 20247,516
October 20247,899
August 20249,227
July 20249,653
May 20248,604
April 20247,919
February 20247,429
January 20248,029

Source: EIA Form EIA-923, through August 2026.

How much of Maryland's electricity comes from the Central Utility Plant at White Oak plant?

Central Utility Plant at White Oak made 0.2% of the 37,475,103 MWh reported by Maryland plants in 2025, from 0.4% of the state's 13,377 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 24th largest of 236 plants in Maryland, the 3,654th largest of 14,327 in the U.S. and the 1,105th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 20th largest of 226 generating plants in the state.

Central Utility Plant at White Oak within Maryland, 2025
MeasureThis plantMarylandShare
Capacity (MW)5413,3770.4%
Generation (MWh)93,66837,475,1030.2%
Natural gas capacity (MW)476,3470.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Central Utility Plant at White Oak plant, and when do they retire?

12 operable generators total 54.3 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s52138%none reported
2010s73362%none reported
Every generator, 12 in all
UnitStatusTechnologyMWIn servicePlanned retirement
G1OperatingNatural Gas Internal Combustion Engine62003n/a
G2On standbyPetroleum Liquids22003n/a
G3OperatingNatural Gas Fired Combustion Turbine42003n/a
G4OperatingNatural Gas Fired Combustion Turbine42008n/a
G5OperatingNatural Gas Fired Combustion Turbine42009n/a
G6OperatingNatural Gas Fired Combustion Turbine42010n/a
G7OperatingNatural Gas Fired Combined Cycle82014n/a
G8OperatingNatural Gas Fired Combined Cycle82014n/a
G9OperatingNatural Gas Fired Combined Cycle52014n/a
G10OperatingPetroleum Liquids22014n/a
G11OperatingPetroleum Liquids22014n/a
G12OperatingNatural Gas Fired Combined Cycle52014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Central Utility Plant at White Oak plant?

EIA lists no joint owners for Central Utility Plant at White Oak. GSA Metropolitan Service Center operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Central Utility Plant at White Oak plant use?

Central Utility Plant at White Oak has capacity on 2 fuels: 87% natural gas and 13% petroleum. In 2025, natural gas made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas4787.3%93,205
Petroleum712.7%463

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Central Utility Plant at White Oak plant?

Central Utility Plant at White Oak is in Silver Spring, Montgomery County, Maryland, at 39.0394° N, 76.9825° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Maryland are similar in size?

Maryland has 16 operable natural gas plants with 6,347 MW of capacity, and Central Utility Plant at White Oak's 47.4 MW is 1% of that.

Natural gas plants in Maryland around this size
PlantCountyMW2025 MWh
Central Utility Plant at White OakMontgomery4793,205
NIH Cogeneration FacilityMontgomery28152,409

Source: EIA Forms EIA-860 and EIA-923, 2025.