Charles P Keller is a 29.4 MW natural gas power plant in Nassau County, New York, operated by Village of Rockville Centre-(NY), and it generated 1,001 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 4th percentile of U.S. natural gas plants. By 2025 generation it ranks 11,850th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

29.4 MWNameplate capacity
under 1%Capacity factor, 2025, 4th percentile, on 28.8 MW net summer
11,850thU.S. rank by generation, 2025
55 yearsAverage generator age, by MW

How hard does the Charles P Keller plant run compared with other natural gas plants?

The Charles P Keller plant had a capacity factor of under 1% in 2025 on 28.8 MW of net summer capacity, the 4th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Charles P Kellerunder 1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Charles P Keller plant generating more or less than last year?

Generation at Charles P Keller rose 713.8% from 2024 to 2025, from 123 MWh to 1,001 MWh.

Net generation by period
PeriodMWh
2024123
20251,001
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202587
November 202568
October 202563
September 202572
August 202592
July 2025110
June 202579
May 202557
April 202556
March 202560
February 202595
January 2025160
December 202415
November 20248
October 20248
September 20249
August 202411
July 202412
June 20249
May 20248
April 20247
March 202410
February 20248
January 202418

Source: EIA Form EIA-923, through August 2026.

How much of New York's electricity comes from the Charles P Keller plant?

Charles P Keller made 0.0% of the 130,607,810 MWh reported by New York plants in 2025, from 0.1% of the state's 44,194 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 132nd largest of 1,145 plants in New York, the 4,423rd largest of 14,327 in the U.S. and the 1,214th largest of 1,962 natural gas plants. By 2025 generation it is the 971st largest of 1,049 generating plants in the state.

Charles P Keller within New York, 2025
MeasureThis plantNew YorkShare
Capacity (MW)2944,1940.1%
Generation (MWh)1,001130,607,8100.0%
Natural gas capacity (MW)2924,2550.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Charles P Keller plant, and when do they retire?

6 operable generators total 29.4 MW, with an average age of 55 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 4.4 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s2724%none reported
1960s21136%none reported
1970s1619%none reported
1990s1621%none reported
Every generator, 8 in all
UnitStatusTechnologyMWIn servicePlanned retirement
9OperatingNatural Gas Internal Combustion Engine41954n/a
10OperatingNatural Gas Internal Combustion Engine41954n/a
11OperatingNatural Gas Internal Combustion Engine51962n/a
12OperatingNatural Gas Internal Combustion Engine61967n/a
13OperatingNatural Gas Internal Combustion Engine61974n/a
14OperatingNatural Gas Internal Combustion Engine61994n/a
7RetiredPetroleum Liquids219422018
8RetiredPetroleum Liquids219502017

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Charles P Keller plant?

EIA lists no joint owners for Charles P Keller. Village of Rockville Centre-(NY) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Village of Rockville Centre charge homes?

Village of Rockville Centre, the operator of Charles P Keller, had an average residential price of 12.34¢ per kWh and an average bill of $95 a month in 2019, 53% below the New York average of 26.39¢.

Average residential price and bill, 2019
MeasurePriceMonthly billAgainst New York
Village of Rockville Centre12.34¢$9553% lower
New York average26.39¢$155
U.S. average17.23¢$15135% lower

Source: EIA Form EIA-861, final 2019. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Charles P Keller plant?

Charles P Keller is in Rockville Centre, Nassau County, New York, at 40.6583° N, 73.6406° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in New York are similar in size?

New York has 104 operable natural gas plants with 24,255 MW of capacity, and Charles P Keller's 29.4 MW is 0% of that.

Natural gas plants in New York around this size
PlantCountyMW2025 MWh
ShoemakerOrange42639
RiverbayBronx4288,121
Cornell University Central HeatTompkins38229,708
Charles P KellerNassau29857
Ogdensburg PowerSt Lawrence27n/a
University of RochesterMonroe2526,788
Lederle LaboratoriesRockland23148,300

Source: EIA Forms EIA-860 and EIA-923, 2025.