Wind power plant, Pennsylvania
Chestnut Flats Wind Farm, Pennsylvania
Chestnut Flats Wind Farm is a 38 MW wind power plant in Blair County, Pennsylvania, operated by UPC Power Solutions, and it generated 90,285 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 29th percentile of U.S. wind plants. By 2025 generation it ranks 3,504th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Chestnut Flats Wind Farm plant run compared with other wind plants?
The Chestnut Flats Wind Farm plant had a capacity factor of 27% in 2025 on 38 MW of net summer capacity, the 29th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 99 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Chestnut Flats Wind Farm | 27% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Chestnut Flats Wind Farm plant generating more or less than last year?
Generation at Chestnut Flats Wind Farm fell 0.4% from 2024 to 2025, from 90,674 MWh to 90,285 MWh.
| Period | MWh |
|---|---|
| 2024 | 90,674 |
| 2025 | 90,285 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 9,828 |
| November 2025 | 10,795 |
| October 2025 | 6,964 |
| September 2025 | 2,271 |
| August 2025 | 2,851 |
| July 2025 | 2,869 |
| June 2025 | 5,260 |
| May 2025 | 8,481 |
| April 2025 | 8,875 |
| March 2025 | 12,760 |
| February 2025 | 6,748 |
| January 2025 | 12,583 |
| December 2024 | 10,162 |
| November 2024 | 10,962 |
| October 2024 | 7,023 |
| September 2024 | 4,855 |
| August 2024 | 4,169 |
| July 2024 | 3,645 |
| June 2024 | 5,176 |
| May 2024 | 4,864 |
| April 2024 | 8,647 |
| March 2024 | 11,695 |
| February 2024 | 8,053 |
| January 2024 | 11,423 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Chestnut Flats Wind Farm plant, and when do they retire?
1 operable generator totals 38 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 38 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 38 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Chestnut Flats Wind Farm plant?
EIA lists no joint owners for Chestnut Flats Wind Farm. UPC Power Solutions operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Chestnut Flats Wind Farm plant?
Chestnut Flats Wind Farm is in Altoona, Blair County, Pennsylvania, at 40.5228° N, 78.4769° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Pennsylvania are similar in size?
Pennsylvania has 27 operable wind plants with 1,556 MW of capacity, and Chestnut Flats Wind Farm's 38 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| South Chestnut LLC | Fayette | 50 | 109,247 |
| Sandy Ridge Wind Farm | Blair | 50 | 131,144 |
| Ringer Hill Wind Farm, LLC | Somerset | 40 | 95,371 |
| Chestnut Flats Wind Farm | Blair | 38 | 90,285 |
| Lookout Windpower LLC | Somerset | 38 | 91,114 |
| Casselman Wind Power Project | Somerset | 35 | 90,964 |
| Meyersdale Windpower, LLC | Somerset | 30 | 32,767 |
Source: EIA Forms EIA-860 and EIA-923, 2025.