Battery and pumped storage power plant, Missouri

Clarence Cannon storage power plant, Missouri

Clarence Cannon is a 58 MW power plant, 31 MW of it battery and pumped storage, in Ralls County, Missouri, operated by USCE-St Louis District, and it generated 95,698 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Missouri, and its capacity factor sits at the 78th percentile of U.S. battery and pumped storage plants. By 2025 generation it ranks 3,444th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

58 MWNameplate capacity
18%Capacity factor, 2025, battery and pumped storage units, 78th percentile, on 31 MW net summer
0.1%Of MO generation, 2025
41 yearsAverage generator age, by MW

How hard does the Clarence Cannon plant run compared with other battery and pumped storage plants?

The Clarence Cannon plant's battery and pumped storage units had a capacity factor of 18% in 2025 on 31 MW of net summer capacity, the 78th percentile of the 9 U.S. battery and pumped storage plants with at least 20 MW. The typical battery and pumped storage plant reached 6%. That equals about 64 days at full output out of 365.

0%Shaded: the middle half of battery and pumped storage plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Clarence Cannon18%
Battery and pumped storage plants, 75th percentile14%
Battery and pumped storage plants, median6%
Battery and pumped storage plants, 25th percentile5%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its battery and pumped storage generators only. Values above 105% are left out of the comparison.

Is the Clarence Cannon plant generating more or less than last year?

Clarence Cannon generated 95,698 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 35.8% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202497,716
202595,698
2026 through August118,118
2025, same months86,996
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20265,170
July 202619,980
June 202631,030
May 202625,128
April 202627,990
March 20267,850
February 2026-6
January 2026976
December 20251,074
November 2025308
October 20252,360
September 20254,960
August 202517,700
July 20259,734
June 202520,788
May 20254,536
April 202530,866
March 2025758
February 20251,872
January 2025742
December 2024-26
November 2024102
October 20242,106
September 20244,060
August 202418,948
July 20249,292
June 202415,630
May 202439,296
April 20242,298
March 20241,606
February 20244,060
January 2024344

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Clarence Cannon plant?

Clarence Cannon made 0.1% of the 71,443,096 MWh reported by Missouri plants in 2025, from 0.2% of the state's 23,215 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 54th largest of 137 plants in Missouri, the 3,583rd largest of 14,327 in the U.S. and the 218th largest of 557 battery and pumped storage plants on its battery and pumped storage units alone. By 2025 generation it is the 39th largest of 122 generating plants in the state.

Clarence Cannon within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)5823,2150.2%
Generation (MWh)95,69871,443,0960.1%
Battery and pumped storage capacity (MW)316015.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Clarence Cannon plant, and when do they retire?

2 operable generators total 58 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s258100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric271984n/a
2OperatingHydroelectric Pumped Storage311984n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Clarence Cannon plant?

EIA lists no joint owners for Clarence Cannon. USCE-St Louis District operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Clarence Cannon plant use?

Clarence Cannon has capacity on 2 fuels: 53% battery and pumped storage and 47% hydro. In 2025, battery and pumped storage made 50% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Battery and pumped storage3153.4%47,849
Hydro2746.6%47,849

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Clarence Cannon plant?

Clarence Cannon is in Monroe City, Ralls County, Missouri, at 39.5248° N, 91.6440° W. It sits in the Associated Electric Cooperative, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.