Battery and pumped storage power plant, Missouri
Clarence Cannon storage power plant, Missouri
Clarence Cannon is a 58 MW power plant, 31 MW of it battery and pumped storage, in Ralls County, Missouri, operated by USCE-St Louis District, and it generated 95,698 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Missouri, and its capacity factor sits at the 78th percentile of U.S. battery and pumped storage plants. By 2025 generation it ranks 3,444th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Clarence Cannon plant run compared with other battery and pumped storage plants?
The Clarence Cannon plant's battery and pumped storage units had a capacity factor of 18% in 2025 on 31 MW of net summer capacity, the 78th percentile of the 9 U.S. battery and pumped storage plants with at least 20 MW. The typical battery and pumped storage plant reached 6%. That equals about 64 days at full output out of 365.
0%Shaded: the middle half of battery and pumped storage plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Clarence Cannon | 18% |
| Battery and pumped storage plants, 75th percentile | 14% |
| Battery and pumped storage plants, median | 6% |
| Battery and pumped storage plants, 25th percentile | 5% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its battery and pumped storage generators only. Values above 105% are left out of the comparison.
Is the Clarence Cannon plant generating more or less than last year?
Clarence Cannon generated 95,698 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 35.8% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.
2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 97,716 |
| 2025 | 95,698 |
| 2026 through August | 118,118 |
| 2025, same months | 86,996 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 5,170 |
| July 2026 | 19,980 |
| June 2026 | 31,030 |
| May 2026 | 25,128 |
| April 2026 | 27,990 |
| March 2026 | 7,850 |
| February 2026 | -6 |
| January 2026 | 976 |
| December 2025 | 1,074 |
| November 2025 | 308 |
| October 2025 | 2,360 |
| September 2025 | 4,960 |
| August 2025 | 17,700 |
| July 2025 | 9,734 |
| June 2025 | 20,788 |
| May 2025 | 4,536 |
| April 2025 | 30,866 |
| March 2025 | 758 |
| February 2025 | 1,872 |
| January 2025 | 742 |
| December 2024 | -26 |
| November 2024 | 102 |
| October 2024 | 2,106 |
| September 2024 | 4,060 |
| August 2024 | 18,948 |
| July 2024 | 9,292 |
| June 2024 | 15,630 |
| May 2024 | 39,296 |
| April 2024 | 2,298 |
| March 2024 | 1,606 |
| February 2024 | 4,060 |
| January 2024 | 344 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Clarence Cannon plant, and when do they retire?
2 operable generators total 58 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 2 | 58 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 27 | 1984 | n/a |
| 2 | Operating | Hydroelectric Pumped Storage | 31 | 1984 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Clarence Cannon plant?
EIA lists no joint owners for Clarence Cannon. USCE-St Louis District operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Clarence Cannon plant use?
Clarence Cannon has capacity on 2 fuels: 53% battery and pumped storage and 47% hydro. In 2025, battery and pumped storage made 50% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Battery and pumped storage | 31 | 53.4% | 47,849 |
| Hydro | 27 | 46.6% | 47,849 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Clarence Cannon plant?
Clarence Cannon is in Monroe City, Ralls County, Missouri, at 39.5248° N, 91.6440° W. It sits in the Associated Electric Cooperative, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.