Skip to main content
RateWatt

Coal power plant, Montana

Colstrip Energy LP coal power plant, Montana

Colstrip Energy LP is a 46.1 MW coal power plant in Rosebud County, Montana, operated by Colstrip Energy LP, and it generated 277,536 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Montana, and its capacity factor sits at the 97th percentile of U.S. coal plants. By 2025 generation it ranks 2,069th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

46.1 MWNameplate capacity
83%Capacity factor, 2025, 97th percentile, on 38 MW net summer
1.0%Of MT generation, 2025
35 yearsAverage generator age, by MW

How hard does the Colstrip Energy LP plant run compared with other coal plants?

The Colstrip Energy LP plant had a capacity factor of 83% in 2025 on 38 MW of net summer capacity, the 97th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 303 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Colstrip Energy LP83%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Colstrip Energy LP plant generating more or less than last year?

Colstrip Energy LP generated 277,536 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024287,519
2025277,536
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202527,247
November 202527,349
October 202510,587
September 202525,458
August 20255,995
July 202525,329
June 202518,603
May 202528,096
April 202526,640
March 202528,737
February 202525,055
January 202528,440
December 202421,365
November 202426,240
October 202424,458
September 202426,668
August 202427,976
July 202427,103
June 202427,630
May 202427,058
April 20240
March 202425,726
February 202426,565
January 202426,730

Source: EIA Form EIA-923, through August 2026.

How much of Montana's electricity comes from the Colstrip Energy LP plant?

Colstrip Energy LP made 1.0% of the 26,725,203 MWh reported by Montana plants in 2025, from 0.6% of the state's 7,662 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 36th largest of 73 plants in Montana, the 3,950th largest of 14,327 in the U.S. and the 174th largest of 195 coal plants. By 2025 generation it is the 21st largest of 71 generating plants in the state.

Colstrip Energy LP within Montana, 2025
MeasureThis plantMontanaShare
Capacity (MW)467,6620.6%
Generation (MWh)277,53626,725,2031.0%
Coal capacity (MW)461,8112.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Colstrip Energy LP plant, and when do they retire?

1 operable generator totals 46.1 MW, with an average age of 35 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s146100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingConventional Steam Coal461990n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Colstrip Energy LP plant?

EIA lists no joint owners for Colstrip Energy LP. Colstrip Energy LP operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Colstrip Energy LP plant?

Colstrip Energy LP is in Colstrip, Rosebud County, Montana, at 45.9752° N, 106.6547° W. It sits in the NorthWestern Energy (NWMT) balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.