Correctional Solar LLC is a 20 MW solar power plant in New Kent County, Virginia, operated by Dominion Renewable Energy, and it generated 31,485 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 17th percentile of U.S. solar plants. By 2025 generation it ranks 4,683rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Correctional Solar LLC plant run compared with other solar plants?
The Correctional Solar LLC plant had a capacity factor of 18% in 2025 on 20 MW of net summer capacity, the 17th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 66 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Correctional Solar LLC | 18% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Correctional Solar LLC plant generating more or less than last year?
Generation at Correctional Solar LLC rose 8.7% from 2024 to 2025, from 28,964 MWh to 31,485 MWh.
| Period | MWh |
|---|---|
| 2024 | 28,964 |
| 2025 | 31,485 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,392 |
| November 2025 | 1,961 |
| October 2025 | 2,520 |
| September 2025 | 1,661 |
| August 2025 | 3,367 |
| July 2025 | 3,674 |
| June 2025 | 3,720 |
| May 2025 | 3,224 |
| April 2025 | 3,388 |
| March 2025 | 3,040 |
| February 2025 | 1,842 |
| January 2025 | 1,696 |
| December 2024 | 1,477 |
| November 2024 | 1,725 |
| October 2024 | 1,600 |
| September 2024 | 1,461 |
| August 2024 | 3,379 |
| July 2024 | 2,663 |
| June 2024 | 4,319 |
| May 2024 | 2,759 |
| April 2024 | 2,741 |
| March 2024 | 2,995 |
| February 2024 | 2,264 |
| January 2024 | 1,581 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Correctional Solar LLC plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 20 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Correctional Solar LLC plant?
EIA lists no joint owners for Correctional Solar LLC. Dominion Renewable Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Correctional Solar LLC plant?
Correctional Solar LLC is in Barhamsville, New Kent County, Virginia, at 37.4715° N, 76.8446° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Correctional Solar LLC's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mechanicsville Solar | Hanover | 25 | 55,365 |
| Remington Solar Facility | Fauquier | 20 | 35,386 |
| Whitehouse Solar Farm | Louisa | 20 | 33,308 |
| Correctional Solar LLC | New Kent | 20 | 31,485 |
| Sussex Drive, LLC | Sussex | 20 | 39,249 |
| Scott-II Solar LLC | Powhatan | 20 | 38,913 |
| Hecate Energy Cherrydale LLC | Northampton | 20 | 33,195 |
Source: EIA Forms EIA-860 and EIA-923, 2025.