Skip to main content
RateWatt

Geothermal power plant, California

Coso Power Developers geothermal power plant, California

Coso Power Developers is a 90 MW geothermal power plant in Inyo County, California, operated by Coso Operating Co LLC, and it generated 315,145 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 20th percentile of U.S. geothermal plants. By 2025 generation it ranks 1,908th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

90 MWNameplate capacity
45%Capacity factor, 2025, 20th percentile, on 80.3 MW net summer
0.2%Of CA generation, 2025
36 yearsAverage generator age, by MW

How hard does the Coso Power Developers plant run compared with other geothermal plants?

The Coso Power Developers plant had a capacity factor of 45% in 2025 on 80.3 MW of net summer capacity, the 20th percentile of the 49 U.S. geothermal plants with at least 20 MW. The typical geothermal plant reached 66%. That equals about 164 days at full output out of 365.

0%Shaded: the middle half of geothermal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Coso Power Developers45%
Geothermal plants, 75th percentile81%
Geothermal plants, median66%
Geothermal plants, 25th percentile51%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Coso Power Developers plant generating more or less than last year?

Generation at Coso Power Developers rose 1.7% from 2024 to 2025, from 310,015 MWh to 315,145 MWh. Through August 2026 it is running 0.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024310,015
2025315,145
2026 through August200,784
2025, same months202,428
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202624,687
July 202625,447
June 202625,339
May 202626,384
April 202623,998
March 202626,829
February 202623,579
January 202624,521
December 202531,528
November 202529,070
October 202527,361
September 202524,758
August 202526,920
July 202525,338
June 202525,506
May 202527,228
April 202519,497
March 202525,471
February 202525,143
January 202527,325
December 202423,948
November 202423,343
October 202424,726
September 202424,611
August 202426,066
July 202426,246
June 202427,743
May 202431,081
April 202422,137
March 202426,853
February 202424,576
January 202428,685

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Coso Power Developers plant?

Coso Power Developers made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.8 times its share of capacity. By capacity it is the 304th largest of 1,877 plants in California, the 2,850th largest of 14,327 in the U.S. and the 9th largest of 66 geothermal plants. By 2025 generation it is the 161st largest of 1,608 generating plants in the state.

Coso Power Developers within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)90107,4330.1%
Generation (MWh)315,145204,542,8980.2%
Geothermal capacity (MW)902,9363.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Coso Power Developers plant, and when do they retire?

3 operable generators total 90 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s390100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN4OperatingGeothermal301989n/a
GEN5OperatingGeothermal301989n/a
GEN6OperatingGeothermal301989n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Coso Power Developers plant?

EIA lists no joint owners for Coso Power Developers. Coso Operating Co LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Coso Power Developers plant?

Coso Power Developers is in Inyokern, Inyo County, California, at 36.0192° N, 117.7917° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which geothermal plants in California are similar in size?

California has 32 operable geothermal plants with 2,936 MW of capacity, and Coso Power Developers' 90 MW is 3% of that.

Geothermal plants in California around this size
PlantCountyMW2025 MWh
Geothermal 2Sonoma110321,675
Coso Finance PartnersInyo92364,954
Heber GeothermalImperial92376,280
Coso Power DevelopersInyo90315,145
Coso Energy DevelopersInyo90234,957
North Brawley Geothermal PlantImperial808,392
Sonoma California GeothermalLake78435,646

Source: EIA Forms EIA-860 and EIA-923, 2025.