Hydro power plant, North Carolina

Cowans Ford hydroelectric power plant, North Carolina

Cowans Ford is a 350 MW hydro power plant in Lincoln County, North Carolina, operated by Duke Energy Carolinas, LLC, and it generated 124,930 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in North Carolina, and its capacity factor sits at the 2nd percentile of U.S. hydro plants. By 2025 generation it ranks 3,149th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

350 MWNameplate capacity
4%Capacity factor, 2025, 2nd percentile, on 324 MW net summer
0.1%Of NC generation, 2025
61 yearsAverage generator age, by MW

How hard does the Cowans Ford plant run compared with other hydro plants?

The Cowans Ford plant had a capacity factor of 4% in 2025 on 324 MW of net summer capacity, the 2nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 16 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cowans Ford4%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cowans Ford plant generating more or less than last year?

Generation at Cowans Ford fell 31.4% from 2024 to 2025, from 182,023 MWh to 124,930 MWh.

Net generation by period
PeriodMWh
2024182,023
2025124,930
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20255,417
November 20255,557
October 20257,596
September 20256,774
August 202512,657
July 20259,800
June 202513,758
May 202515,195
April 20256,539
March 202510,311
February 202517,710
January 202513,616
December 202413,563
November 20248,571
October 202417,752
September 202430,349
August 202411,770
July 20246,490
June 20247,551
May 202418,790
April 202410,953
March 202418,321
February 202418,440
January 202419,473

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Cowans Ford plant?

Cowans Ford made 0.1% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.9% of the state's 39,933 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 928 plants in North Carolina, the 923rd largest of 14,327 in the U.S. and the 41st largest of 1,393 hydro plants. By 2025 generation it is the 62nd largest of 872 generating plants in the state.

Cowans Ford within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)35039,9330.9%
Generation (MWh)124,930134,194,4340.1%
Hydro capacity (MW)3501,79219.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cowans Ford plant, and when do they retire?

4 operable generators total 350 MW, with an average age of 61 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1960s4350100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric881963n/a
2OperatingConventional Hydroelectric881963n/a
3OperatingConventional Hydroelectric881963n/a
4OperatingConventional Hydroelectric881967n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cowans Ford plant?

EIA lists no joint owners for Cowans Ford. Duke Energy Carolinas, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Carolinas, LLC charge homes?

Duke Energy Carolinas, LLC, the operator of Cowans Ford, had an average residential price of 13.41¢ per kWh and an average bill of $134 a month in 2025, 4% below the North Carolina average of 14.00¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst North Carolina
Duke Energy Carolinas, LLC13.41¢$1344% lower
North Carolina average14.00¢$146
U.S. average17.23¢$15123% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Cowans Ford plant?

Cowans Ford is in Stanley, Lincoln County, North Carolina, at 35.4346° N, 80.9588° W. It sits in the Duke Energy Carolinas balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in North Carolina are similar in size?

North Carolina has 37 operable hydro plants with 1,792 MW of capacity, and Cowans Ford's 350 MW is 20% of that.

Hydro plants in North Carolina around this size
PlantCountyMW2025 MWh
Cowans FordLincoln350124,930
Fontana DamSwain255900,232
GastonHalifax178225,599

Source: EIA Forms EIA-860 and EIA-923, 2025.