Skip to main content
RateWatt

Biomass power plant, North Carolina

Craven County Wood Energy LP biomass power plant, North Carolina

Craven County Wood Energy LP is a 50 MW biomass power plant in Craven County, North Carolina, operated by CMS Generation Operating Co II, and it generated 284,361 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in North Carolina, and its capacity factor sits at the 81st percentile of U.S. biomass plants. By 2025 generation it ranks 2,044th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
69%Capacity factor, 2025, 81st percentile, on 47 MW net summer
0.2%Of NC generation, 2025
35 yearsAverage generator age, by MW

How hard does the Craven County Wood Energy LP plant run compared with other biomass plants?

The Craven County Wood Energy LP plant had a capacity factor of 69% in 2025 on 47 MW of net summer capacity, the 81st percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 252 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Craven County Wood Energy LP69%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Craven County Wood Energy LP plant generating more or less than last year?

Generation at Craven County Wood Energy LP rose 9.1% from 2024 to 2025, from 260,534 MWh to 284,361 MWh. Through August 2026 it is running 25.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024260,534
2025284,361
2026 through August147,797
2025, same months197,355
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20260
July 202611,910
June 202623,986
May 202614,859
April 202619,278
March 202625,134
February 202625,703
January 202626,927
December 202521,391
November 202522,623
October 202516,280
September 202526,712
August 202523,689
July 202526,834
June 202527,583
May 202527,872
April 202515,648
March 202527,456
February 202522,601
January 202525,672
December 202415,134
November 202417,928
October 202429,857
September 202421,138
August 202412,303
July 20244,862
June 202430,787
May 202425,258
April 202422,669
March 202426,099
February 202423,783
January 202430,716

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Craven County Wood Energy LP plant?

Craven County Wood Energy LP made 0.2% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.1% of the state's 39,933 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 80th largest of 928 plants in North Carolina, the 3,754th largest of 14,327 in the U.S. and the 90th largest of 585 biomass plants. By 2025 generation it is the 29th largest of 872 generating plants in the state.

Craven County Wood Energy LP within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)5039,9330.1%
Generation (MWh)284,361134,194,4340.2%
Biomass capacity (MW)5042411.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Craven County Wood Energy LP plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 35 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1UNIOperatingWood/Wood Waste Biomass501990n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Craven County Wood Energy LP plant?

2 owners report shares in Craven County Wood Energy LP; CMS Generation MI Power LLC holds the largest named share, 50.0% or about 25 MW. CMS Generation Operating Co II operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
CMS Generation MI Power LLC50.0%25142,181
Atlantic Power Corporation50.0%25142,181

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Craven County Wood Energy LP plant?

Craven County Wood Energy LP is in New Bern, Craven County, North Carolina, at 35.1302° N, 77.1679° W. It sits in the Duke Energy Progress East balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in North Carolina are similar in size?

North Carolina has 24 operable biomass plants with 424 MW of capacity, and Craven County Wood Energy LP's 50 MW is 12% of that.

Biomass plants in North Carolina around this size
PlantCountyMW2025 MWh
International Paper Riegelwood MillColumbus84294,438
Craven County Wood Energy LPCraven50284,361
International Paper Co. - New Bern MillCraven38170,026
LumbertonRobeson35n/a
KapStone Kraft Paper CorpHalifax28144,055

Source: EIA Forms EIA-860 and EIA-923, 2025.