Cumberland (NJ) is a 231 MW natural gas power plant in Cumberland County, New Jersey, operated by Calpine New Jersey Generation LLC, and it generated 119,393 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in New Jersey, and its capacity factor sits at the 29th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,206th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

231 MWNameplate capacity
7%Capacity factor, 2025, 29th percentile, on 187 MW net summer
0.2%Of NJ generation, 2025
24 yearsAverage generator age, by MW

How hard does the Cumberland (NJ) plant run compared with other natural gas plants?

The Cumberland (NJ) plant had a capacity factor of 7% in 2025 on 187 MW of net summer capacity, the 29th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 26 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cumberland (NJ)7%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cumberland (NJ) plant generating more or less than last year?

Generation at Cumberland (NJ) rose 99.3% from 2024 to 2025, from 59,906 MWh to 119,393 MWh.

Net generation by period
PeriodMWh
202459,906
2025119,393
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202511,416
November 202513,785
October 202519,686
September 202527
August 202510,150
July 202522,216
June 20258,626
May 20252,224
April 20254,687
March 20256,918
February 202515,350
January 20254,308
December 2024202
November 20243,112
October 20245,739
September 20242,016
August 20246,755
July 202411,996
June 20246,507
May 20248,386
April 20244,377
March 20246,501
February 20241,383
January 20242,933

Source: EIA Form EIA-923, through August 2026.

How much of New Jersey's electricity comes from the Cumberland (NJ) plant?

Cumberland (NJ) made 0.2% of the 60,873,773 MWh reported by New Jersey plants in 2025, from 1.3% of the state's 18,172 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 20th largest of 416 plants in New Jersey, the 1,354th largest of 14,327 in the U.S. and the 680th largest of 1,962 natural gas plants. By 2025 generation it is the 22nd largest of 387 generating plants in the state.

Cumberland (NJ) within New Jersey, 2025
MeasureThis plantNew JerseyShare
Capacity (MW)23118,1721.3%
Generation (MWh)119,39360,873,7730.2%
Natural gas capacity (MW)23112,3461.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cumberland (NJ) plant, and when do they retire?

2 operable generators total 231 MW, with an average age of 24 years weighted by capacity at the end of 2025. 99.4 MW, 43% of operable capacity, has a planned retirement, the first in 2027.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s19943%2027
2000s113257%none reported
Capacity retiring by year
YearUnitsMW retiringShare of plant
202719943%
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CUMBOperatingNatural Gas Fired Combustion Turbine9919902027
CUMB2OperatingNatural Gas Fired Combustion Turbine1322009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cumberland (NJ) plant?

EIA lists no joint owners for Cumberland (NJ). Calpine New Jersey Generation LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Cumberland (NJ) plant?

Cumberland (NJ) is in Millville, Cumberland County, New Jersey, at 39.3757° N, 74.9654° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in New Jersey are similar in size?

New Jersey has 50 operable natural gas plants with 12,346 MW of capacity, and Cumberland (NJ)'s 231 MW is 2% of that.

Natural gas plants in New Jersey around this size
PlantCountyMW2025 MWh
NAEA Lakewood LLCOcean288226,027
Eagle Point Power GenerationGloucester252178,083
Burlington Generating StationBurlington24252,340
Cumberland (NJ)Cumberland231115,760
SayrevilleMiddlesex212334
Camden Plant Holding LLCCamden17397,880

Source: EIA Forms EIA-860 and EIA-923, 2025.