Natural gas power plant, California

Cuyamaca Peak Energy Plant, California

Cuyamaca Peak Energy Plant is a 48.7 MW natural gas power plant in San Diego County, California, operated by San Diego Gas & Electric Co, and it generated 9,748 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 15th percentile of U.S. natural gas plants. By 2025 generation it ranks 6,155th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

48.7 MWNameplate capacity
2%Capacity factor, 2025, 15th percentile, on 48.7 MW net summer
6,155thU.S. rank by generation, 2025
23 yearsAverage generator age, by MW

How hard does Cuyamaca Peak Energy Plant run compared with other natural gas plants?

Cuyamaca Peak Energy Plant had a capacity factor of 2% in 2025 on 48.7 MW of net summer capacity, the 15th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 8 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cuyamaca Peak Energy Plant2%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Cuyamaca Peak Energy Plant generating more or less than last year?

Cuyamaca Peak Energy Plant generated 9,748 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
20245,874
20259,748
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025798
November 2025953
October 2025866
September 20251,096
August 20251,232
July 2025866
June 2025667
May 2025578
April 2025475
March 2025535
February 2025717
January 2025964
December 2024165
November 20240
October 20241,178
September 20241,485
August 20241,213
July 20241,038
June 2024292
May 20243
April 20240
March 2024164
February 202478
January 2024259

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from Cuyamaca Peak Energy Plant?

Cuyamaca Peak Energy Plant made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 447th largest of 1,877 plants in California, the 3,888th largest of 14,327 in the U.S. and the 1,094th largest of 1,962 natural gas plants. By 2025 generation it is the 832nd largest of 1,608 generating plants in the state.

Cuyamaca Peak Energy Plant within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)49107,4330.0%
Generation (MWh)9,748204,542,8980.0%
Natural gas capacity (MW)4940,2110.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Cuyamaca Peak Energy Plant, and when do they retire?

1 operable generator totals 48.7 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s149100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CPP6OperatingNatural Gas Fired Combustion Turbine492002n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Cuyamaca Peak Energy Plant?

EIA lists no joint owners for Cuyamaca Peak Energy Plant. San Diego Gas & Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does San Diego Gas & Electric Co charge homes?

San Diego Gas & Electric Co, the operator of Cuyamaca Peak Energy Plant, had an average residential price of 45.77¢ per kWh and an average bill of $168 a month in 2025, 46% above the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
San Diego Gas & Electric Co45.77¢$16846% higher
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Cuyamaca Peak Energy Plant?

Cuyamaca Peak Energy Plant is in El Cajon, San Diego County, California, at 32.7965° N, 116.9721° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Cuyamaca Peak Energy Plant's 48.7 MW is 0% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Santa Ynez FacilitySanta Barbara49n/a
Clearwater Power PlantRiverside493,539
Kern River Eastridge CogenKern49224,726
Cuyamaca Peak Energy PlantSan Diego499,748
E F Oxnard Energy FacilityVentura494,705
US BoraxKern48274,462
Creed Energy CenterSolano482,560