Natural gas power plant, Michigan
Dearborn Industrial Generation natural gas power plant, Michigan
Dearborn Industrial Generation is a 748 MW power plant, 510 MW of it natural gas, in Wayne County, Michigan, operated by Dearborn Industrial Gen Inc, and it generated 3,866,829 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.0% of the generation reported in Michigan, and its capacity factor sits at the 95th percentile of U.S. natural gas plants. By 2025 generation it ranks 300th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Dearborn Industrial Generation plant run compared with other natural gas plants?
The Dearborn Industrial Generation plant's natural gas units had a capacity factor of 84% in 2025 on 515 MW of net summer capacity, the 95th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 305 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Dearborn Industrial Generation | 84% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is the Dearborn Industrial Generation plant generating more or less than last year?
Generation at Dearborn Industrial Generation fell 31.7% from 2024 to 2025, from 5,662,997 MWh to 3,866,829 MWh. Through August 2026 it is running 74.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 5,662,997 |
| 2025 | 3,866,829 |
| 2026 through August | 3,831,664 |
| 2025, same months | 2,196,483 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 488,948 |
| July 2026 | 481,992 |
| June 2026 | 422,833 |
| May 2026 | 474,596 |
| April 2026 | 466,714 |
| March 2026 | 485,144 |
| February 2026 | 495,264 |
| January 2026 | 516,173 |
| December 2025 | 397,419 |
| November 2025 | 327,595 |
| October 2025 | 508,147 |
| September 2025 | 437,185 |
| August 2025 | 472,627 |
| July 2025 | 485,233 |
| June 2025 | 341,457 |
| May 2025 | 158,375 |
| April 2025 | 40,831 |
| March 2025 | 40,601 |
| February 2025 | 309,808 |
| January 2025 | 347,551 |
| December 2024 | 459,066 |
| November 2024 | 470,162 |
| October 2024 | 472,548 |
| September 2024 | 452,246 |
| August 2024 | 495,958 |
| July 2024 | 499,085 |
| June 2024 | 453,803 |
| May 2024 | 396,767 |
| April 2024 | 402,226 |
| March 2024 | 525,771 |
| February 2024 | 489,571 |
| January 2024 | 545,794 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Dearborn Industrial Generation plant, and when do they retire?
4 operable generators total 748 MW, with an average age of 25 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 195 | 26% | none reported |
| 2000s | 3 | 553 | 74% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GTP1 | Operating | Natural Gas Fired Combustion Turbine | 195 | 1999 | n/a |
| GT 1 | Operating | Natural Gas Fired Combined Cycle | 157 | 2001 | n/a |
| GT2 | Operating | Natural Gas Fired Combined Cycle | 157 | 2001 | n/a |
| ST1 | Operating | Other Gases | 238 | 2001 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Dearborn Industrial Generation plant?
EIA lists no joint owners for Dearborn Industrial Generation. Dearborn Industrial Gen Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Dearborn Industrial Generation plant use?
Dearborn Industrial Generation has capacity on 2 fuels: 68% natural gas and 32% other-fuel. In 2025, natural gas made 97% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 510 | 68.2% | 3,768,922 |
| Other-fuel | 238 | 31.8% | 97,907 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Dearborn Industrial Generation plant?
Dearborn Industrial Generation is in Dearborn, Wayne County, Michigan, at 42.3026° N, 83.1540° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Michigan are similar in size?
Michigan has 60 operable natural gas plants with 14,397 MW of capacity, and Dearborn Industrial Generation's 510 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Zeeland Generating Station | Ottawa | 968 | 5,314,363 |
| Renaissance Power Plant | Montcalm | 782 | 1,234,095 |
| Jackson Generating Station | Jackson | 649 | 1,958,496 |
| Dearborn Industrial Generation | Wayne | 510 | 3,768,922 |
| Alpine Power Plant | Otsego | 454 | 775,507 |
| Dean | St Clair | 358 | 704,817 |
| Sumpter | Wayne | 340 | 290,873 |
Source: EIA Forms EIA-860 and EIA-923, 2025.