Wind power plant, North Carolina

Desert Wind Farm, LLC power plant, North Carolina

Desert Wind Farm, LLC is a 208 MW wind power plant in Perquimans County, North Carolina, operated by Avangrid Power LLC, and it generated 560,677 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in North Carolina, and its capacity factor sits at the 42nd percentile of U.S. wind plants. By 2025 generation it ranks 1,210th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

208 MWNameplate capacity
31%Capacity factor, 2025, 42nd percentile, on 208 MW net summer
0.4%Of NC generation, 2025
9 yearsAverage generator age, by MW

How hard does the Desert Wind Farm, LLC plant run compared with other wind plants?

The Desert Wind Farm, LLC plant had a capacity factor of 31% in 2025 on 208 MW of net summer capacity, the 42nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 112 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Desert Wind Farm, LLC31%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Desert Wind Farm, LLC plant generating more or less than last year?

Generation at Desert Wind Farm, LLC rose 10.2% from 2024 to 2025, from 508,991 MWh to 560,677 MWh. Through August 2026 it is running 4.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024508,991
2025560,677
2026 through August339,058
2025, same months354,738
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,066
July 202622,544
June 202634,340
May 202642,379
April 202653,585
March 202664,721
February 202650,031
January 202653,392
December 202551,772
November 202550,357
October 202563,200
September 202540,610
August 202526,207
July 202527,439
June 202523,049
May 202544,629
April 202559,141
March 202567,101
February 202548,801
January 202558,371
December 202452,915
November 202447,573
October 202432,268
September 202435,517
August 202424,738
July 202429,542
June 202428,121
May 202431,682
April 202460,610
March 202461,448
February 202450,797
January 202453,780

Source: EIA Form EIA-923, through August 2026.

How much of North Carolina's electricity comes from the Desert Wind Farm, LLC plant?

Desert Wind Farm, LLC made 0.4% of the 134,194,434 MWh reported by North Carolina plants in 2025, from 0.5% of the state's 39,933 MW of capacity. By capacity it is the 26th largest of 928 plants in North Carolina, the 1,445th largest of 14,327 in the U.S. and the 217th largest of 1,358 wind plants. By 2025 generation it is the 22nd largest of 872 generating plants in the state.

Desert Wind Farm, LLC within North Carolina, 2025
MeasureThis plantNorth CarolinaShare
Capacity (MW)20839,9330.5%
Generation (MWh)560,677134,194,4340.4%
Wind capacity (MW)20839752.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Desert Wind Farm, LLC plant, and when do they retire?

1 operable generator totals 208 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1208100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2082016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Desert Wind Farm, LLC plant?

EIA lists no joint owners for Desert Wind Farm, LLC. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Desert Wind Farm, LLC plant?

Desert Wind Farm, LLC is in Hertford, Perquimans County, North Carolina, at 36.3100° N, 76.4200° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in North Carolina are similar in size?

North Carolina has 2 operable wind plants with 397 MW of capacity, and Desert Wind Farm, LLC's 208 MW is 52% of that.

Wind plants in North Carolina around this size
PlantCountyMW2025 MWh
Desert Wind Farm, LLCPerquimans208560,677
Timbermill Wind, LLCChowan189375,577

Source: EIA Forms EIA-860 and EIA-923, 2025.