Durrance is a 60 MW solar power plant in Polk County, Florida, operated by Tampa Electric Co, and it generated 50,421 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 7th percentile of U.S. solar plants. By 2025 generation it ranks 4,082nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

60 MWNameplate capacity
10%Capacity factor, 2025, 7th percentile, on 60 MW net summer
4,082ndU.S. rank by generation, 2025
4 yearsAverage generator age, by MW

How hard does the Durrance plant run compared with other solar plants?

The Durrance plant had a capacity factor of 10% in 2025 on 60 MW of net summer capacity, the 7th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 35 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Durrance10%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Durrance plant generating more or less than last year?

Durrance generated 50,421 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 259.6% ahead of the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

5 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202488,571
202550,421
2026 through August76,108
2025, same months21,165
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,224
July 20269,919
June 20269,940
May 202610,894
April 202610,384
March 202610,335
February 20267,964
January 20267,448
December 20256,719
November 20257,472
October 20257,745
September 20257,320
August 20256,853
July 20256,599
June 20253,600
May 20251,785
April 20252,430
March 2025-35
February 2025-30
January 2025-37
December 2024-35
November 2024-36
October 20241,366
September 20248,569
August 20249,356
July 202410,560
June 202410,702
May 202412,530
April 202411,586
March 20249,673
February 20248,594
January 20245,706

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Durrance plant?

Durrance made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 226th largest of 331 plants in Florida, the 3,517th largest of 14,327 in the U.S. and the 810th largest of 7,223 solar plants. By 2025 generation it is the 244th largest of 313 generating plants in the state.

Durrance within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)6079,9360.1%
Generation (MWh)50,421267,867,7350.0%
Solar capacity (MW)6012,2230.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Durrance plant, and when do they retire?

1 operable generator totals 60 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s160100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic602021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Durrance plant?

EIA lists no joint owners for Durrance. Tampa Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Tampa Electric Co charge homes?

Tampa Electric Co, the operator of Durrance, had an average residential price of 17.32¢ per kWh and an average bill of $194 a month in 2025, 14% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Tampa Electric Co17.32¢$19414% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Durrance plant?

Durrance is in Mulberry, Polk County, Florida, at 27.7800° N, 81.9800° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Durrance's 60 MW is 0% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Laurel Oaks SolarHillsborough61123,887
Grange Hall SolarHillsborough61119,476
Alafia SolarPolk60117,711
DurrancePolk6050,421
Peace Creek SolarPolk5596,737
Riverside SolarHillsborough55108,650
Mountain View Solar (FL)Pasco55102,520

Source: EIA Forms EIA-860 and EIA-923, 2025.