Dynegy Oakland Power Plant is a 149 MW petroleum power plant in Alameda County, California, operated by Dynegy Oakland, LLC, and it generated 2,277 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 23rd percentile of U.S. petroleum plants. By 2025 generation it ranks 10,367th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Dynegy Oakland Power Plant run compared with other petroleum plants?
Dynegy Oakland Power Plant had a capacity factor of under 1% in 2025 on 110 MW of net summer capacity, the 23rd percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.
0%Shaded: the middle half of petroleum plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Dynegy Oakland Power Plant | under 1% |
| Petroleum plants, 75th percentile | 1% |
| Petroleum plants, median | 1% |
| Petroleum plants, 25th percentile | 0% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Dynegy Oakland Power Plant generating more or less than last year?
Dynegy Oakland Power Plant generated 2,277 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 69.4% behind the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 5,346 |
| 2025 | 2,277 |
| 2026 through August | 663 |
| 2025, same months | 2,165 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 33 |
| July 2026 | 0 |
| June 2026 | 0 |
| May 2026 | 380 |
| April 2026 | 161 |
| March 2026 | 0 |
| February 2026 | 89 |
| January 2026 | 0 |
| December 2025 | 0 |
| November 2025 | 59 |
| October 2025 | 0 |
| September 2025 | 53 |
| August 2025 | 502 |
| July 2025 | 67 |
| June 2025 | 265 |
| May 2025 | 197 |
| April 2025 | 73 |
| March 2025 | 162 |
| February 2025 | 41 |
| January 2025 | 858 |
| December 2024 | 0 |
| November 2024 | 406 |
| October 2024 | 85 |
| September 2024 | 0 |
| August 2024 | 178 |
| July 2024 | 697 |
| June 2024 | 52 |
| May 2024 | 0 |
| April 2024 | 0 |
| March 2024 | 1,693 |
| February 2024 | 442 |
| January 2024 | 1,793 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Dynegy Oakland Power Plant, and when do they retire?
2 operable generators total 149 MW, with an average age of 47 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 43.3 MW. 1 has already retired, totalling 74.5 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 2 | 149 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Petroleum Liquids | 75 | 1978 | n/a |
| GEN3 | Operating | Petroleum Liquids | 75 | 1978 | n/a |
| GEN4 | Planned, not yet approved | Batteries | 43 | 2028 | n/a |
| GEN2 | Retired | Petroleum Liquids | 75 | 1978 | 2021 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Dynegy Oakland Power Plant?
EIA lists no joint owners for Dynegy Oakland Power Plant. Dynegy Oakland, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Dynegy Oakland Power Plant?
Dynegy Oakland Power Plant is in Oakland, Alameda County, California, at 37.7968° N, 122.2819° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which petroleum plants in California are similar in size?
California has 16 operable petroleum plants with 452 MW of capacity, and Dynegy Oakland Power Plant's 149 MW is 33% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Dynegy Oakland Power Plant | Alameda | 149 | 2,277 |
| SC 1 Data Center, Phase 2 | Santa Clara | 100 | 380 |