East Bend coal power plant, Kentucky

East Bend is a 772 MW coal power plant in Boone County, Kentucky, operated by Duke Energy Kentucky Inc, and it generated 2,593,872 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.5% of the generation reported in Kentucky, and its capacity factor sits at the 48th percentile of U.S. coal plants. By 2025 generation it ranks 433rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

772 MWNameplate capacity
49%Capacity factor, 2025, 48th percentile, on 600 MW net summer
3.5%Of KY generation, 2025
44 yearsAverage generator age, by MW

How hard does the East Bend plant run compared with other coal plants?

The East Bend plant had a capacity factor of 49% in 2025 on 600 MW of net summer capacity, the 48th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 179 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
East Bend49%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the East Bend plant generating more or less than last year?

East Bend generated 2,593,872 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 11.2% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
20242,264,495
20252,593,872
2026 through August2,271,621
2025, same months2,043,511
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026265,288
July 2026360,884
June 2026192,170
May 2026234,704
April 2026318,588
March 2026215,332
February 2026320,867
January 2026363,788
December 2025361,402
November 2025173,668
October 2025-3,674
September 202518,965
August 2025326,218
July 2025362,688
June 2025245,491
May 2025154,255
April 2025176,141
March 2025201,042
February 2025239,749
January 2025337,927
December 2024243,874
November 2024128,953
October 2024-4,396
September 202447,208
August 2024294,642
July 2024306,948
June 2024284,083
May 202489,974
April 2024108,183
March 2024272,661
February 2024263,912
January 2024228,453

Source: EIA Form EIA-923, through August 2026.

How much of Kentucky's electricity comes from the East Bend plant?

East Bend made 3.5% of the 73,948,902 MWh reported by Kentucky plants in 2025, from 3.5% of the state's 22,180 MW of capacity. By capacity it is the 11th largest of 62 plants in Kentucky, the 435th largest of 14,327 in the U.S. and the 89th largest of 195 coal plants. By 2025 generation it is the 8th largest of 59 generating plants in the state.

East Bend within Kentucky, 2025
MeasureThis plantKentuckyShare
Capacity (MW)77222,1803.5%
Generation (MWh)2,593,87273,948,9023.5%
Coal capacity (MW)7729,7977.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the East Bend plant, and when do they retire?

1 operable generator totals 772 MW, with an average age of 44 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s1772100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2OperatingConventional Steam Coal7721981n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the East Bend plant?

EIA lists no joint owners for East Bend. Duke Energy Kentucky Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the East Bend plant?

East Bend is in Union, Boone County, Kentucky, at 38.9036° N, 84.8514° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Kentucky are similar in size?

Kentucky has 8 operable coal plants with 9,797 MW of capacity, and East Bend's 772 MW is 8% of that.

Coal plants in Kentucky around this size
PlantCountyMW2025 MWh
Trimble CountyTrimble1,4007,875,195
Mill Creek (KY)Jefferson1,3627,160,904
East BendBoone7722,579,610
D B WilsonOhio5092,322,185