Petroleum power plant, New York
East Hampton petroleum power plant, New York
East Hampton is a 27.3 MW petroleum power plant in Suffolk County, New York, operated by National Grid Generation LLC, and it generated 10,865 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 84th percentile of U.S. petroleum plants. By 2025 generation it ranks 5,969th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the East Hampton plant run compared with other petroleum plants?
The East Hampton plant had a capacity factor of 5% in 2025 on 25.2 MW of net summer capacity, the 84th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. That equals about 18 days at full output out of 365.
0%Shaded: the middle half of petroleum plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| East Hampton | 5% |
| Petroleum plants, 75th percentile | 1% |
| Petroleum plants, median | 1% |
| Petroleum plants, 25th percentile | 0% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the East Hampton plant generating more or less than last year?
East Hampton generated 10,865 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 9 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 11,518 |
| 2025 | 10,865 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 517 |
| November 2025 | 69 |
| October 2025 | 18 |
| September 2025 | 123 |
| August 2025 | 2,858 |
| July 2025 | 5,332 |
| June 2025 | 1,423 |
| May 2025 | 109 |
| April 2025 | 0 |
| March 2025 | 63 |
| February 2025 | 277 |
| January 2025 | 76 |
| December 2024 | 0 |
| November 2024 | 7 |
| October 2024 | 0 |
| September 2024 | 228 |
| August 2024 | 4,318 |
| July 2024 | 5,011 |
| June 2024 | 1,134 |
| May 2024 | 22 |
| April 2024 | 520 |
| March 2024 | 0 |
| February 2024 | 56 |
| January 2024 | 222 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the East Hampton plant, and when do they retire?
4 operable generators total 27.3 MW, with an average age of 57 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1960s | 3 | 6 | 22% | none reported |
| 1970s | 1 | 21 | 78% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 2 | Operating | Petroleum Liquids | 2 | 1962 | n/a |
| 3 | Operating | Petroleum Liquids | 2 | 1962 | n/a |
| 4 | Operating | Petroleum Liquids | 2 | 1962 | n/a |
| 1 | Operating | Petroleum Liquids | 21 | 1970 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the East Hampton plant?
EIA lists no joint owners for East Hampton. National Grid Generation LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the East Hampton plant?
East Hampton is in East Hampton, Suffolk County, New York, at 40.9617° N, 72.2103° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which petroleum plants in New York are similar in size?
New York has 70 operable petroleum plants with 3,462 MW of capacity, and East Hampton's 27.3 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| West Babylon | Suffolk | 52 | n/a |
| 74th Street | New York | 37 | 54 |
| Regeneron Pharmaceuticals Inc. | Westchester | 30 | 217 |
| East Hampton | Suffolk | 27 | 10,865 |
| NYU LANGONE HEALTH | New York | 27 | 396 |
| The Mount Sinai Hospital | New York | 18 | 372 |
| New York Presbyterian Hospital- 68th Street | New York | 15 | 90 |
Source: EIA Forms EIA-860 and EIA-923, 2025.