Skip to main content
RateWatt

Hydro power plant, Michigan

Edison Sault hydroelectric power plant, Michigan

Edison Sault is a 41.8 MW hydro power plant in Chippewa County, Michigan, operated by Cloverland Electric Co-op, and it generated 180,785 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Michigan, and its capacity factor sits at the 98th percentile of U.S. hydro plants. By 2025 generation it ranks 2,639th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

41.8 MWNameplate capacity
71%Capacity factor, 2025, 98th percentile, on 29.2 MW net summer
0.1%Of MI generation, 2025
75 yearsAverage generator age, by MW

How hard does the Edison Sault plant run compared with other hydro plants?

The Edison Sault plant had a capacity factor of 71% in 2025 on 29.2 MW of net summer capacity, the 98th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 258 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edison Sault71%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Edison Sault plant generating more or less than last year?

Generation at Edison Sault fell 9.2% from 2024 to 2025, from 199,042 MWh to 180,785 MWh.

Net generation by period
PeriodMWh
2024199,042
2025180,785
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202518,706
November 202519,860
October 202520,587
September 202515,783
August 202515,426
July 202516,110
June 202513,984
May 202516,700
April 20259,752
March 202510,426
February 202510,466
January 202512,985
December 202417,448
November 202419,263
October 202419,893
September 202417,848
August 202416,491
July 202415,012
June 202415,113
May 202415,468
April 202415,565
March 202415,468
February 202414,151
January 202417,322

Source: EIA Form EIA-923, through August 2026.

How much of Michigan's electricity comes from the Edison Sault plant?

Edison Sault made 0.1% of the 127,929,498 MWh reported by Michigan plants in 2025, from 0.1% of the state's 34,725 MW of capacity. By capacity it is the 88th largest of 283 plants in Michigan, the 4,048th largest of 14,327 in the U.S. and the 301st largest of 1,393 hydro plants. By 2025 generation it is the 63rd largest of 261 generating plants in the state.

Edison Sault within Michigan, 2025
MeasureThis plantMichiganShare
Capacity (MW)4234,7250.1%
Generation (MWh)180,785127,929,4980.1%
Hydro capacity (MW)4235011.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edison Sault plant, and when do they retire?

73 operable generators total 41.8 MW, with an average age of 75 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1900s213%none reported
1910s201024%none reported
1960s513173%none reported
Every generator, 73 in all
UnitStatusTechnologyMWIn servicePlanned retirement
41OperatingConventional Hydroelectric11901n/a
42OperatingConventional Hydroelectric11901n/a
45OperatingConventional Hydroelectric11916n/a
62OperatingConventional Hydroelectric11916n/a
63OperatingConventional Hydroelectric11916n/a
64OperatingConventional Hydroelectric11916n/a
65OperatingConventional Hydroelectric11916n/a
66OperatingConventional Hydroelectric11916n/a
67OperatingConventional Hydroelectric11916n/a
68OperatingConventional Hydroelectric11916n/a
69OperatingConventional Hydroelectric11916n/a
70OperatingConventional Hydroelectric11916n/a
71OperatingConventional Hydroelectric11916n/a
72OperatingConventional Hydroelectric11916n/a
73OperatingConventional Hydroelectric11916n/a
74OperatingConventional Hydroelectric11916n/a
75OperatingConventional Hydroelectric11916n/a
76OperatingConventional Hydroelectric11916n/a
77OperatingConventional Hydroelectric11916n/a
78OperatingConventional Hydroelectric11916n/a
79OperatingConventional Hydroelectric11916n/a
80OperatingConventional Hydroelectric11916n/a
6OperatingConventional Hydroelectric11963n/a
7OperatingConventional Hydroelectric11963n/a
8OperatingConventional Hydroelectric11963n/a
9OperatingConventional Hydroelectric11963n/a
10OperatingConventional Hydroelectric11963n/a
11OperatingConventional Hydroelectric11963n/a
12OperatingConventional Hydroelectric11963n/a
13OperatingConventional Hydroelectric11963n/a
14OperatingConventional Hydroelectric11963n/a
15OperatingConventional Hydroelectric11963n/a
16OperatingConventional Hydroelectric11963n/a
17OperatingConventional Hydroelectric11963n/a
18OperatingConventional Hydroelectric11963n/a
19OperatingConventional Hydroelectric11963n/a
20OperatingConventional Hydroelectric11963n/a
21OperatingConventional Hydroelectric11963n/a
22OperatingConventional Hydroelectric11963n/a
23OperatingConventional Hydroelectric11963n/a
24OperatingConventional Hydroelectric11963n/a
25OperatingConventional Hydroelectric11963n/a
26OperatingConventional Hydroelectric11963n/a
27OperatingConventional Hydroelectric11963n/a
28OperatingConventional Hydroelectric11963n/a
29OperatingConventional Hydroelectric11963n/a
30OperatingConventional Hydroelectric11963n/a
31OperatingConventional Hydroelectric11963n/a
32OperatingConventional Hydroelectric11963n/a
33OperatingConventional Hydroelectric11963n/a
34OperatingConventional Hydroelectric11963n/a
35OperatingConventional Hydroelectric11963n/a
36OperatingConventional Hydroelectric11963n/a
37OperatingConventional Hydroelectric11963n/a
38OperatingConventional Hydroelectric11963n/a
39OperatingConventional Hydroelectric11963n/a
40OperatingConventional Hydroelectric11963n/a
46OperatingConventional Hydroelectric11963n/a
47OperatingConventional Hydroelectric11963n/a
48OperatingConventional Hydroelectric11963n/a
49OperatingConventional Hydroelectric11963n/a
50OperatingConventional Hydroelectric11963n/a
51OperatingConventional Hydroelectric11963n/a
52OperatingConventional Hydroelectric11963n/a
53OperatingConventional Hydroelectric11963n/a
54OperatingConventional Hydroelectric11963n/a
55OperatingConventional Hydroelectric11963n/a
56OperatingConventional Hydroelectric11963n/a
57OperatingConventional Hydroelectric11963n/a
58OperatingConventional Hydroelectric11963n/a
59OperatingConventional Hydroelectric11963n/a
60OperatingConventional Hydroelectric11963n/a
61OperatingConventional Hydroelectric11963n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edison Sault plant?

EIA lists no joint owners for Edison Sault. Cloverland Electric Co-op operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Cloverland Electric Co-op charge homes?

Cloverland Electric Co-op, the operator of Edison Sault, had an average residential price of 14.27¢ per kWh and an average bill of $101 a month in 2025, 29% below the Michigan average of 20.03¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Michigan
Cloverland Electric Co-op14.27¢$10129% lower
Michigan average20.03¢$127
U.S. average17.23¢$15114% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Edison Sault plant?

Edison Sault is in Sault Ste. Marie, Chippewa County, Michigan, at 46.4974° N, 84.3320° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Michigan are similar in size?

Michigan has 50 operable hydro plants with 350 MW of capacity, and Edison Sault's 41.8 MW is 12% of that.

Hydro plants in Michigan around this size
PlantCountyMW2025 MWh
Edison SaultChippewa42180,785
HardyNewaygo3264,947
Saint Marys FallsChippewa24156,043

Source: EIA Forms EIA-860 and EIA-923, 2025.